What the post-plumbing work covers
- Cleaning and preparing the floor and the wall bases
- Treating gaps and cracks around pipe sleeves
- Closing the waterproofing around the drain and the drain outlet
- Applying a continuous layer that turns up at the wall bases and the threshold
- Treating the floor-to-wall corners with care
- Leaving the layer to dry and cure before the build continues
Four steps from the pipe to the sealed layer
Send photos of the bathroom
Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.
Clean and treat the pipe entries
The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.
Apply the waterproof layer
The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.
Dry, then hand back to the contractor
The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.
Why Abraj Al Azl?
The critical points are fully closedSealing pipe sleeves, the drain opening and the corners at this stage cuts off water paths before they are buried under screed and tiles.
No tile-lifting laterSuccessful waterproofing at the post-plumbing stage avoids the need to lift tiles and replumb when a leak shows up later.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Questions about bathroom waterproofing after plumbing
Why is the bathroom waterproofed after plumbing and not before?
Because the plumber drills through the concrete slab and opens the walls to run the pipes. Any layer applied before that work is damaged by it. Waterproofing after plumbing means every hole, every pipe sleeve and every drain opening is treated after it is fixed in place, so no gap is left unsealed under the tiles.
Which points are waterproofed at this stage?
The whole floor and the wall bases and the door threshold, with particular care at the pipe sleeves for water supply and drainage, the floor-to-wall corners and around the drain opening. These are the points where water usually escapes when a leak is found under the tiles.
Does the plumber need to be present during the waterproofing?
The plumber does not need to stay throughout, but all pipes must be fixed in place and their sleeves fitted before we start. If any change to the pipework is still pending, it is better to complete it first so the waterproof layer does not have to be redone.
What materials are used for bathroom waterproofing after plumbing?
It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.
What decides the cost of waterproofing at this stage?
The bathroom size, the number of pipe sleeves, the condition of the floor, the amount of gap around the entries and how easily the space can be reached. A large bathroom with many pipe runs differs from a small one. Send us photos and rough dimensions on WhatsApp and we will set the treatment and its cost.
How long should you wait before tiling after the waterproof layer is applied?
The layer needs enough time to dry and cure before anything goes over it. That time varies with the material used and the bathroom conditions, including ventilation and temperature. We tell you when the work is done so the tiling stage is not rushed.