Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in As Sikak

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in As Sikak

In As Sikak, the work starts with photos of the bathroom floor after its plumbing was redone, along with the wall bases and the drain outlet, sent by call or WhatsApp. The hamlet lies in the Al-Ahsa countryside, where standalone homes, farms and small buildings are common and plumbing is often redone without rebuilding the whole bathroom.

As Sikak has many standalone homes and small farms, where plumbing is often redone by running new pipes through the existing floor without lifting it. That leaves the pipe sleeves and the drain exposed to leaks after repair, especially if the joints were not treated carefully. Near Salwa, Mehdar and Al Batha, buildings differ in age and finish, and some older floors need a full lining. The method is only settled once the photos show the state of each point.

  • As Sikak is a village in Al-Ahsa Governorate in the Eastern Province, lying close to Salwa, Mehdar and Al Batha.
  • When new pipes are run through an existing floor, the openings cut around them are the most common leak point.
What the service includes

The scope of the work in As Sikak

  • Treating the floor-to-wall corners with care
  • Cleaning and preparing the floor and the wall bases
  • Applying a continuous layer that turns up at the wall bases and the threshold
  • Closing the waterproofing around the drain and the drain outlet
How we work

This is how we work in As Sikak

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

No tile-lifting laterSuccessful waterproofing at the post-plumbing stage avoids the need to lift tiles and replumb when a leak shows up later.

Bathroom waterproofing after plumbing in As SikakWe choose the method and the materials once we know the condition of the spot.

We serve As Sikak and around itIncluding Salwa, Mehdar and Al Batha, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing after plumbing in As Sikak

Do you treat the openings cut around pipes in As Sikak?

Yes, these are among the key points of the job. We treat the openings around re-run pipes, and the photos will show whether the floor itself needs wider treatment.

Are photos alone enough to assess a bathroom in As Sikak?

Usually yes, as a starting point. The photos show the openings, the joints and any damp on the walls, and if more detail is needed we will ask for it by phone.

How long should you wait before tiling after the waterproof layer is applied?

The layer needs enough time to dry and cure before anything goes over it. That time varies with the material used and the bathroom conditions, including ventilation and temperature. We tell you when the work is done so the tiling stage is not rushed.

Why is the bathroom waterproofed after plumbing and not before?

Because the plumber drills through the concrete slab and opens the walls to run the pipes. Any layer applied before that work is damaged by it. Waterproofing after plumbing means every hole, every pipe sleeve and every drain opening is treated after it is fixed in place, so no gap is left unsealed under the tiles.

Is As Sikak within your service area?

Yes, As Sikak is one of the areas we work in, as are Salwa, Mehdar and Al Batha. To start, call us or message us on WhatsApp.

What materials are used for bathroom waterproofing after plumbing?

It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Salwa, Mehdar and Al Batha.

Other services in the area

More services in As Sikak

Villa roof finished in white insulation with a glass railing over the sea

We start with you in As Sikak
with one call

Call us or send us photos of the floor and the pipe sleeves on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp