Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in As Sikak

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in As Sikak

Abraj Al Azl applies bathroom waterproofing before tiling in As Sikak, using a continuous membrane on the floor and wet-area walls ahead of adhesive and tiles. We serve As Sikak in the Eastern Province, and enquiries begin with a call or photos sent on WhatsApp.

As Sikak is made up mostly of separate houses and villas on fairly wide plots, with the bathroom often on a single or two-storey level. Trouble usually starts at the corners, around the drain outlet and at the foot of the wall, where water reaches the layers behind the tiles unseen. The floor and the walls around the shower are sealed with a continuous layer before tiling, and the photos confirm how far the membrane must run.

  • As Sikak is a neighbourhood in the Eastern Province, close to Salwa, Mehdar and Al Batha, and dominated by houses and villas.
  • Most bathroom leaks come through corners and floor-to-wall joints, not the middle of the tiled surface.
What the service includes

What we do for you in As Sikak

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

The stages of the work in As Sikak

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve As Sikak and around itIncluding Salwa, Mehdar and Al Batha, as part of our work across the Eastern Province.

Bathroom waterproofing before tiling in As SikakWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in As Sikak

Does the bathroom need clearing before floor waterproofing in As Sikak?

Yes, it is best to clear the bathroom of fittings and old tiles so the floor and corners are reachable. Send photos first so we can tell you what must come out.

Does waterproofing differ between villas and smaller houses in As Sikak?

It can differ with layer depth and how each building drains, which the photos decide more than the building type alone.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Do you offer bathroom waterproofing before tiling in As Sikak?

Yes. As Sikak is within our service area in the Eastern Province, and we also work in Salwa, Mehdar and Al Batha. Call us or send photos of the spot on WhatsApp.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

Bathroom waterproofing before tiling near As Sikak

We also work near As Sikak, in Salwa, Mehdar and Al Batha.

Other services in the area

More services in As Sikak

Worker applying the white insulation layer on a villa roof by the sea

Your first step in As Sikak:
a call or a WhatsApp message

Describe the problem and where it is in As Sikak, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp