Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Batha

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Batha

Waterproofing bathrooms in Al Batha before tiling begins with photos of the space sent to us via WhatsApp or phone. Al Batha comprises small houses and villas, where each bathroom needs complete water protection before tiles and adhesive are fitted.

Al Batha has older houses and newer ones, each with one or more bathrooms. A village bathroom may be more exposed to external moisture than a city one, and some older bathrooms may show seepage under the floor or around pipes. A waterproof membrane before tiling ensures water does not reach the layers beneath. Photos help determine if there are cracks or unevenness in the floor needing prior treatment.

  • Al Batha is a village in the Eastern Province, close to As Sikak, Salwa and Mehdar.
  • A bathroom serving a rural house may be exposed to rainwater entering from outside during the rare but heavy rainy season.
What the service includes

The main items of bathroom waterproofing before tiling in Al Batha

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

The stages of the work in Al Batha

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Al Batha with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bathroom waterproofing before tiling in Al BathaWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Batha

Does waterproofing prevent seepage from beneath the floor?

Yes, the continuous waterproof membrane surrounds the floor and walls and prevents water entering from below or the sides. Photos show if there is existing seepage we need to address first.

Can the waterproof membrane cope with uneven floors in older houses?

It depends on how uneven it is. Relatively level surfaces take the membrane directly, but floors with large variations may need levelling first. Photos show what we need to do.

How do I request bathroom waterproofing before tiling in Al Batha?

Call us, or send clear photos of the spot and its location in Al Batha on WhatsApp, and we will work out the next step with you.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

We also offer it in neighbouring areas

We also offer bathroom waterproofing before tiling in As Sikak, Salwa and Mehdar, among the closest areas to Al Batha.

Other services in the area

More services in Al Batha

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Batha?
Call us now

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp