Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Batha

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Batha

Bitumen bathroom waterproofing in Al Batha begins with a message containing photos of the bathroom and a phone number. The village has many homes of varying ages, and its bathrooms are exposed to high moisture since rare rainwater can seep through walls and floors. Bitumen provides protection before tiling.

Al Batha is a small village with old homes and some relatively new ones. Its bathrooms need bitumen treatment because moisture accumulates and water can breach the foundation. The floor and lower walls are the key areas, especially at drains and pipe entries. Bitumen is applied after the surface is cleaned and any cracks repaired, forming a solid barrier before sand and tiles. Photos show the condition of the homes and their bathrooms.

  • Al Batha is a village in the Eastern Province, near As Sikak, Salwa and Mehdar, with several rural homes.
  • A bathroom in a small village may be old and its foundation exposed to moisture, so bitumen waterproofing is needed before any surface finish.
What the service includes

The main items of bitumen bathroom waterproofing in Al Batha

  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
How we work

The steps of bitumen bathroom waterproofing in Al Batha

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Batha comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Batha is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Batha

Do small cracks in the bathroom floor affect how well bitumen works?

Yes, cracks small or large may let water through. We fill them first with suitable material, then apply bitumen to a clean, even surface. Photos show the size and nature of the cracks.

What is the difference between waterproofing an old bathroom and a new one with bitumen?

An old bathroom may need deeper cleaning and crack repair, while a new one usually has a clean surface. But in both cases bitumen is applied the same way to form a strong water barrier. Photos determine what your case needs.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Do you cover Al Batha?

Yes. We serve Al Batha and nearby areas such as As Sikak, Salwa and Mehdar, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Batha, the same service is available in As Sikak, Salwa and Mehdar.

Other services in the area

More services in Al Batha

Pool at night with water jets after waterproofing

In Al Batha and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp