Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Salwa

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Salwa

We offer bitumen bathroom waterproofing in Salwa, and it starts with photos of the bathroom floor and wall bases sent by call or WhatsApp. The village is mostly made up of houses and private homes, where bathrooms are often built before the final finishes go on.

Salwa is made up of family houses and private homes, and its bathrooms range from recently built to those that have been reworked over time. Bitumen goes onto the floor and the wall bases before screed and tiles, which keeps water from passing into the layers beneath. Because a bathroom faces repeated water and damp, this step matters before finishing. The photos show which parts need treatment and which only need the lining checked.

  • Salwa is a village in the Eastern Province, close to Mehdar, As Sikak and Al Batha.
  • Most damp damage in bathrooms gathers at wall bases and floor joints, not in the middle of the tiles.
What the service includes

What the service covers in Salwa

  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

This is how we work in Salwa

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Salwa with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Salwa is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Salwa

Can bitumen be applied to existing bathrooms in Salwa?

It depends on the state of the floor and the tiles already in place. If the layers beneath are sound, work can proceed; if they are damaged, the photos will show it before any decision.

What happens to the bitumen before tiling in Salwa?

The bitumen is left to dry and set before screed and tiles go over it, so the waterproofing layer stays intact during finishing.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Is Salwa within your service area?

Yes, Salwa is one of the areas we work in, as are Mehdar, As Sikak and Al Batha. To start, call us or message us on WhatsApp.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Bitumen bathroom waterproofing near Salwa

Nearby areas we also cover: Mehdar, As Sikak and Al Batha.

Other services in the area

More services in Salwa

Pool at night with water jets after waterproofing

We start with you in Salwa
with one call

Describe the problem and where it is in Salwa, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp