Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Al Uthmaniyah

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Al Uthmaniyah

Bathroom waterproofing after plumbing in Al Uthmaniyah starts with photos of the floor, the wall bases and the pipe openings, sent by call or WhatsApp. We seal the floor and the base of the walls around the pipes and the drain outlet once the plumbing work is finished.

Al Uthmaniyah is a small hamlet of standalone houses and farm plots, where bathrooms are often fitted into existing walls or added within a larger house. When new plumbing is installed, pipes pass through the floor and walls, so sealing around the sleeves and the drain matters most. The photos show whether the surface needs preparing before the lining goes on, rather than assuming it does.

  • Al Uthmaniyah is a small hamlet in the Eastern Province, lying close to Udhailiyah and Al Matar District.
  • Pipes passing through a bathroom floor are the usual weak point, so the sleeves need the most attention.
What the service includes

The scope of the work in Al Uthmaniyah

  • Applying a continuous layer that turns up at the wall bases and the threshold
  • Closing the waterproofing around the drain and the drain outlet
  • Treating the floor-to-wall corners with care
  • Leaving the layer to dry and cure before the build continues
How we work

This is how we work in Al Uthmaniyah

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

No tile-lifting laterSuccessful waterproofing at the post-plumbing stage avoids the need to lift tiles and replumb when a leak shows up later.

Al Uthmaniyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Uthmaniyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Uthmaniyah

Can bathroom waterproofing be done in an existing house here?

Often yes, provided the floor and wall bases are sound. Send photos of the old tiling and the pipe openings, and we will tell you whether the existing surface can take the lining or needs preparing first.

Should the plumbing be finished before waterproofing starts?

It is best to finish the pipe and drain work first, so the sleeves and outlet are sealed in their final positions. If plumbing is still in progress, tell us in your message and we will plan the order with you.

Which points are waterproofed at this stage?

The whole floor and the wall bases and the door threshold, with particular care at the pipe sleeves for water supply and drainage, the floor-to-wall corners and around the drain opening. These are the points where water usually escapes when a leak is found under the tiles.

What should I send you from Al Uthmaniyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Uthmaniyah, and we will work out the next step with you.

What decides the cost of waterproofing at this stage?

The bathroom size, the number of pipe sleeves, the condition of the floor, the amount of gap around the entries and how easily the space can be reached. A large bathroom with many pipe runs differs from a small one. Send us photos and rough dimensions on WhatsApp and we will set the treatment and its cost.

What materials are used for bathroom waterproofing after plumbing?

It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.

Nearby areas

Bathroom waterproofing after plumbing near Al Uthmaniyah

If the site is outside Al Uthmaniyah, the same service is available in Udhailiyah, Al Matar District and Imam Muhammed Ibn Saud Islamic University District.

Other services in the area

More services in Al Uthmaniyah

Villa roof finished in white insulation with a glass railing over the sea

We start with you in Al Uthmaniyah
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp