Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Al Naseem

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Al Naseem

Bathroom waterproofing after plumbing in Al Naseem begins with photos of the tiling, the wall edges and the drain outlet, sent by call or WhatsApp. The work centres on where tiles meet the walls and on the pipes passing through the floor, so the photos can show what needs lining and what only needs repair.

Al Naseem combines apartments, attached houses and some villas, and bathroom ages vary widely. An older bathroom often shows cracked grout between tiles and worn plaster at the wall base, both of which let damp move behind the finish. A recently refitted bathroom may have pipe openings that were never fully closed. The photos decide whether the problem is limited to the grout or needs wider lining.

  • Al Naseem is a district in the Eastern Province, lying close to Qurtubah, Al Ghadir and Al Khisab.
  • Damp in tiled bathrooms usually travels through grout and the wall base before it shows on the surface.
What the service includes

The main items of bathroom waterproofing after plumbing in Al Naseem

  • Closing the waterproofing around the drain and the drain outlet
  • Applying a continuous layer that turns up at the wall bases and the threshold
  • Cleaning and preparing the floor and the wall bases
  • Leaving the layer to dry and cure before the build continues
How we work

This is how we work in Al Naseem

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

The critical points are fully closedSealing pipe sleeves, the drain opening and the corners at this stage cuts off water paths before they are buried under screed and tiles.

Al Naseem is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Naseem with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing after plumbing in Al Naseem

Is regrouting tiles enough in Al Naseem?

It may be enough if the damage is only on the surface and has not reached behind the tiles. If damp is showing behind the tiles, a deeper check is needed, and the photos will show which case is closer to yours.

Do you waterproof apartment bathrooms in Al Naseem?

Yes, we serve Al Naseem. Send photos of your bathroom and tell us whether it is on an upper floor or above a neighbour, as that affects how we reach the pipes and the drain outlet.

How do I request bathroom waterproofing after plumbing in Al Naseem?

Call us, or send clear photos of the spot and its location in Al Naseem on WhatsApp, and we will work out the next step with you.

Which points are waterproofed at this stage?

The whole floor and the wall bases and the door threshold, with particular care at the pipe sleeves for water supply and drainage, the floor-to-wall corners and around the drain opening. These are the points where water usually escapes when a leak is found under the tiles.

Does the plumber need to be present during the waterproofing?

The plumber does not need to stay throughout, but all pipes must be fixed in place and their sleeves fitted before we start. If any change to the pipework is still pending, it is better to complete it first so the waterproof layer does not have to be redone.

What decides the cost of waterproofing at this stage?

The bathroom size, the number of pipe sleeves, the condition of the floor, the amount of gap around the entries and how easily the space can be reached. A large bathroom with many pipe runs differs from a small one. Send us photos and rough dimensions on WhatsApp and we will set the treatment and its cost.

Nearby areas

The same service in nearby areas

If the site is outside Al Naseem, the same service is available in Qurtubah (near Inak), Al Ghadir and Al Khisab.

Other services in the area

More services in Al Naseem

Villa roof finished in white insulation with a glass railing over the sea

Your first step in Al Naseem:
a call or a WhatsApp message

Call us or send us photos of the floor and the pipe sleeves on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp