Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Al Matar (near An Nabiyah)

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Al Matar (near An Nabiyah)

We offer bathroom waterproofing after plumbing work in Al Matar, Dammam, treating bathroom floors, wall bases, pipe openings and the drain outlet. Send photos by call or WhatsApp so we can settle on the method.

Al Matar contains family homes and residential apartments, lying close to Al Amanah, Ash Shrouk and Al Fursan. Bathrooms there are sometimes renovated with new pipework, and the joints around pipes and the drain outlet remain the points most open to leaks after installation. The photos will show whether the fault lies in the new joint or in a worn older waterproofing layer.

  • Al Matar is a district in Dammam in the Eastern Province, close to Al Amanah, Ash Shrouk and Al Fursan.
  • A new joint often reveals its fault within days of installation rather than months.
What the service includes

The main items of bathroom waterproofing after plumbing in Al Matar (near An Nabiyah)

  • Treating the floor-to-wall corners with care
  • Applying a continuous layer that turns up at the wall bases and the threshold
  • Closing the waterproofing around the drain and the drain outlet
  • Leaving the layer to dry and cure before the build continues
How we work

The stages of the work in Al Matar (near An Nabiyah)

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

No tile-lifting laterSuccessful waterproofing at the post-plumbing stage avoids the need to lift tiles and replumb when a leak shows up later.

We serve Al Matar (near An Nabiyah) and around itIncluding Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan, as part of our work across the Eastern Province.

Your request from Al Matar (near An Nabiyah) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing after plumbing in Al Matar (near An Nabiyah)

What do we check first in an Al Matar bathroom after plumbing work?

We check the joints around the drain outlet and the pipes leaving the wall, then the wall base and floor. These points decide whether the work is spot or wider.

Is the method decided from photos alone in Al Matar?

It is first set from the photos and description, then confirmed when work begins. If something not shown in the photos appears, we will tell you before going further.

What decides the cost of waterproofing at this stage?

The bathroom size, the number of pipe sleeves, the condition of the floor, the amount of gap around the entries and how easily the space can be reached. A large bathroom with many pipe runs differs from a small one. Send us photos and rough dimensions on WhatsApp and we will set the treatment and its cost.

What materials are used for bathroom waterproofing after plumbing?

It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.

Does the plumber need to be present during the waterproofing?

The plumber does not need to stay throughout, but all pipes must be fixed in place and their sleeves fitted before we start. If any change to the pipework is still pending, it is better to complete it first so the waterproof layer does not have to be redone.

What should I send you from Al Matar (near An Nabiyah)?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Matar (near An Nabiyah), and we will work out the next step with you.

Nearby areas

Bathroom waterproofing after plumbing near Al Matar (near An Nabiyah)

We also work near Al Matar (near An Nabiyah), in Al Amanah, Ash Shrouk (near An Nabiyah) and Al Fursan.

Other services in the area

More services in Al Matar (near An Nabiyah)

Villa roof finished in white insulation with a glass railing over the sea

We start with you in Al Matar (near An Nabiyah)
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp