Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Al Bustan Two

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Al Bustan Two

Bathroom waterproofing after plumbing in Al Bustan Two starts with photos you send by call or WhatsApp. Al Bustan Two is a residential district of villas and apartment buildings of varying sizes, whose bathrooms need precise waterproofing after new plumbing installation. The coating prevents water seeping to foundations and walls.

Villas and apartment buildings in Al Bustan Two have diverse designs, and each bathroom may come with different plumbing fixtures and varied drain patterns. New concrete floors may have complex shapes because of pipes and drains, and lower walls around outlets face constant humidity. In apartment buildings, bathrooms may be closely spaced, requiring reliable waterproofing to protect adjacent units. Photos show us pipe design, drains and available space so we pick the most suitable waterproofing method.

  • Al Bustan Two is a residential district in the Eastern Province near Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab, with villas and apartment buildings.
  • Bathrooms in closely spaced residential units need waterproofing that stops moisture reaching shared walls with adjacent units.
What the service includes

What the service covers in Al Bustan Two

  • Treating the floor-to-wall corners with care
  • Treating gaps and cracks around pipe sleeves
  • Closing the waterproofing around the drain and the drain outlet
  • Applying a continuous layer that turns up at the wall bases and the threshold
How we work

How we carry out bathroom waterproofing after plumbing in Al Bustan Two

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

The critical points are fully closedSealing pipe sleeves, the drain opening and the corners at this stage cuts off water paths before they are buried under screed and tiles.

Your request from Al Bustan Two comes to usCall or WhatsApp on one number, and we answer you ourselves.

We serve Al Bustan Two and around itIncluding Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Bustan Two

Does waterproofing differ for a bathroom in a villa versus one in an apartment block?

Some details differ. In a villa the bathroom may have exterior walls exposed to coastal humidity, whereas in a block the shared walls between units are the priority. Photos show location and design and we will explain the difference when we call.

If new pipes are complex, does that affect waterproofing cost?

Complexity affects the waterproofing method and materials, not price at this stage. Send clear photos of pipe and drain distribution, we will assess the case and discuss approach and steps with you when we call.

How long should you wait before tiling after the waterproof layer is applied?

The layer needs enough time to dry and cure before anything goes over it. That time varies with the material used and the bathroom conditions, including ventilation and temperature. We tell you when the work is done so the tiling stage is not rushed.

Which points are waterproofed at this stage?

The whole floor and the wall bases and the door threshold, with particular care at the pipe sleeves for water supply and drainage, the floor-to-wall corners and around the drain opening. These are the points where water usually escapes when a leak is found under the tiles.

Is Al Bustan Two within your service area?

Yes, Al Bustan Two is one of the areas we work in, as are Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab. To start, call us or message us on WhatsApp.

Why is the bathroom waterproofed after plumbing and not before?

Because the plumber drills through the concrete slab and opens the walls to run the pipes. Any layer applied before that work is damaged by it. Waterproofing after plumbing means every hole, every pipe sleeve and every drain opening is treated after it is fixed in place, so no gap is left unsealed under the tiles.

Nearby areas

Areas near Al Bustan Two

If the site is outside Al Bustan Two, the same service is available in Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab.

Other services in the area

More services in Al Bustan Two

Villa roof finished in white insulation with a glass railing over the sea

In Al Bustan Two and need bathroom waterproofing after plumbing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp