Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Bustan Two

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Bustan Two

Bathroom waterproofing in Al Bustan Two begins with photos of the floor and wet walls sent by call or WhatsApp. A waterproof membrane before tiling protects the bathroom from water leaks and damp that damages internal walls and floors.

Al Bustan Two is a residential district with apartment blocks and varied family homes, where bathrooms differ in age and design. A bathroom in a modern block may be small and needs careful membrane placement on walls and floor, while an older home may show signs of damp or leaks around pipes. High heat and humidity in the Eastern Province cause materials to shrink and expand, and clear photos pinpoint weak points and the right treatment approach.

  • Al Bustan Two is a district in the Eastern Province near Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab, mixing apartment blocks with villas.
  • Bathrooms in modern apartment blocks may need the membrane applied to small surfaces with high precision to ensure no gaps are left.
What the service includes

The scope of the work in Al Bustan Two

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
How we work

The stages of the work in Al Bustan Two

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from Al Bustan Two comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bathroom waterproofing before tiling in Al Bustan TwoWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Al Bustan Two

Can a bathroom in an apartment block be waterproofed without disturbing neighbours?

Yes, the work only involves removing old tiles and putting on the membrane and new tiles. Send photos of your bathroom so we understand the scope, and any noise is during normal working hours.

What is the difference between waterproofing an old and a new bathroom in Al Bustan Two?

An old bathroom may show damp or cracks needing treatment before the waterproof layer, while a new one has a sound surface and the work moves faster. Photos clarify each bathroom's condition and the steps needed.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Do you cover Al Bustan Two?

Yes. We serve Al Bustan Two and nearby areas such as Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Al Bustan Two

We also offer bathroom waterproofing before tiling in Bab Madinah Ash Shamal, Ash Shamasiyyah and Bab As Sab, among the closest areas to Al Bustan Two.

Other services in the area

More services in Al Bustan Two

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Al Bustan Two
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp