Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in King Faisal University Third

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in King Faisal University Third

Bathroom waterproofing in King Faisal University Third begins with WhatsApp photos of floors, walls and pipes. The district has relatively newer buildings alongside older ones, and bathrooms need waterproofing that tolerates heavy use.

Buildings in the district vary: some house employees and families, others students or staff. A bathroom in such a building bears more pressure than a private villa bathroom, with heavy repeated use and water flow. Common problems are damp around shared drains or seepage from pipe joints. An older building may need thorough crack treatment, a newer one standard waterproofing. Clear photos from different angles show the building's age and the bathroom's current state.

  • King Faisal University Third is a district in the Eastern Province, close to Hajr District, Sports City and Mansubi Al Taleem First District, with residential buildings.
  • In a residential building, a shared bathroom may face higher water pressure than a private one, increasing seepage risk.
What the service includes

The bathroom waterproofing after plumbing work in King Faisal University Third

  • Cleaning and preparing the floor and the wall bases
  • Treating gaps and cracks around pipe sleeves
  • Closing the waterproofing around the drain and the drain outlet
  • Applying a continuous layer that turns up at the wall bases and the threshold
How we work

From first contact to the finished job in King Faisal University Third

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

The critical points are fully closedSealing pipe sleeves, the drain opening and the corners at this stage cuts off water paths before they are buried under screed and tiles.

King Faisal University Third is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from King Faisal University Third comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing after plumbing in King Faisal University Third

If the bathroom is shared between several units, does waterproofing cover all of them?

It depends on the design. If the pipes and drain are shared, yes, we waterproof the whole area. Send a photo showing which units use the bathroom and where the pipes run.

In an older building, does damp in a ground-floor bathroom affect the floors above?

It may if the pipes or drain are on a shared line. Good bathroom waterproofing stops it. But if there is old damp in the structure, broader treatment may be needed, which photos will reveal.

What should I send you from King Faisal University Third?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in King Faisal University Third, and we will work out the next step with you.

Why is the bathroom waterproofed after plumbing and not before?

Because the plumber drills through the concrete slab and opens the walls to run the pipes. Any layer applied before that work is damaged by it. Waterproofing after plumbing means every hole, every pipe sleeve and every drain opening is treated after it is fixed in place, so no gap is left unsealed under the tiles.

Which points are waterproofed at this stage?

The whole floor and the wall bases and the door threshold, with particular care at the pipe sleeves for water supply and drainage, the floor-to-wall corners and around the drain opening. These are the points where water usually escapes when a leak is found under the tiles.

What materials are used for bathroom waterproofing after plumbing?

It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District.

Other services in the area

More services in King Faisal University Third

Villa roof finished in white insulation with a glass railing over the sea

We start with you in King Faisal University Third
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp