Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in King Faisal University Third

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in King Faisal University Third

Bitumen bathroom waterproofing at King Faisal University Third begins with WhatsApp photos of the floor and lower walls before screed and tiling. The area has multi-storey university and residential buildings, where student and staff bathrooms face constant moisture and heavy use.

Bathrooms in university buildings and neighbouring residential complexes vary in size and use. A student or staff bathroom carries a heavy daily water load, and the floor and joints face constant water spray and steam. Pipes in modern buildings are often hidden under the floor or in walls, making joint and corner protection critical. Nearby coastal humidity increases the risk of slow seepage in lower and upper storeys. Clear photos of the bathroom layout will help us choose the most suitable protection method.

  • King Faisal University Third area is in the Eastern Province near Hajr District and Sports City, with university and residential buildings.
  • Bathrooms in modern multi-storey university buildings face heavy daily water loads and rapid humid air flow.
What the service includes

The bitumen bathroom waterproofing work in King Faisal University Third

  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
How we work

This is how we work in King Faisal University Third

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from King Faisal University Third with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve King Faisal University Third and around itIncluding Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in King Faisal University Third

Does waterproofing differ between upper and lower floor bathrooms in university buildings?

Yes, it differs by water pressure and ventilation. A lower floor bathroom may face seepage from above, while an upper one may need waterproofing that tolerates rapid humidity swings. Photos of the bathroom from all angles will help us assess its needs.

Can a shared bathroom in a university residence block be waterproofed while studies are ongoing?

It depends on the maintenance schedule and temporary closure. You will need to coordinate with the residence management to choose a time that does not disrupt use. Send photos of the bathroom so we understand its size and how long the work takes.

Is King Faisal University Third within your service area?

Yes, King Faisal University Third is one of the areas we work in, as are Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District. To start, call us or message us on WhatsApp.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District.

Other services in the area

More services in King Faisal University Third

Pool at night with water jets after waterproofing

Tell us about your site in King Faisal University Third
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp