Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Mansubi Al Taleem First District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Mansubi Al Taleem First District

Bitumen bathroom waterproofing in Mansubi Al Taleem First District starts with photos sent via WhatsApp showing floors and walls. The district has diverse residential buildings with bathrooms that vary in design and concrete condition, affecting which waterproofing method suits best.

Most bathrooms in Mansubi Al Taleem First District are in multi-storey blocks of varying age. New bathrooms need preventive waterproofing on concrete before any finish begins, while older ones may show damp marks or minor leaks needing spot treatment. Bitumen is applied in a layer on the floor and wall bases before screed and tiles, and the dry summer heat and seasonal moisture place demands on the material. Photos show the actual condition and help choose the right method.

  • Mansubi Al Taleem First District is a residential district in the Eastern Province, close to Sports City and Mansubi Al Taleem Second District.
  • A bathroom in a residential block faces intensive use, so it needs reliable waterproofing that handles water, heat and moisture.
What the service includes

The main items of bitumen bathroom waterproofing in Mansubi Al Taleem First District

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
How we work

The steps of bitumen bathroom waterproofing in Mansubi Al Taleem First District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Mansubi Al Taleem First District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Mansubi Al Taleem First District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Mansubi Al Taleem First District

Can an existing bathroom be waterproofed with bitumen without demolition?

It depends on the concrete condition and existing finishes. If there is damp or leakage, we may need to remove parts of the tiles and screed. Send photos and call us so we can assess the situation.

How many bitumen layers does a new bathroom floor need?

The number depends on building details, available materials and expected use. Photos and a phone review help determine the right number to ensure effective protection.

Do you cover Mansubi Al Taleem First District?

Yes. We serve Mansubi Al Taleem First District and nearby areas such as Sports City (near Al-Hofuf), Mansubi Al Taleem Second District and Al Iskan First District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

Areas near Mansubi Al Taleem First District

We also work near Mansubi Al Taleem First District, in Sports City (near Al-Hofuf), Mansubi Al Taleem Second District and Al Iskan First District.

Other services in the area

More services in Mansubi Al Taleem First District

Pool at night with water jets after waterproofing

Tell us about your site in Mansubi Al Taleem First District
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp