Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Iskan First District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Iskan First District

Bitumen bathroom waterproofing in Al Iskan First District starts with photos sent by call or WhatsApp. The district has villas and apartment blocks of mixed ages, where bathroom floors need a waterproof bitumen layer before screed and tiling to stop water seeping through.

The area has older apartment blocks and newer villas, each with bathrooms that differ in size and build. Older bathrooms may show damp marks on the floor or lower walls, newer ones need proper waterproofing before construction is finished. Bitumen is laid on the bathroom floor and base walls before screed and tiling, and this is essential especially where plumbing fixtures are heavy. The photos show the condition of the floor and walls and whether any earlier waterproofing exists.

  • Al Iskan First District is a residential area in Hofuf, Eastern Province, near Al Jamiyin District and Az Zahrah District.
  • Bathroom floors that sit higher or lower than the rest of the building need careful waterproofing treatment at the level transitions.
What the service includes

The scope of the work in Al Iskan First District

  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

How we carry out bitumen bathroom waterproofing in Al Iskan First District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Al Iskan First District and around itIncluding Al Jamiyin District, Az Zahrah District and Mansubi Al Taleem First District, as part of our work across the Eastern Province.

Start from Al Iskan First District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Iskan First District

Is bitumen alone enough for an old bathroom before renovation?

If the concrete floor is sound, yes. But if cracks or weakness appear in the concrete, the photos will show it, and we may need to repair it before laying the bitumen.

When is bitumen laid: before or after the pipes and plumbing are installed?

Bitumen is laid after plumbing and pipes are complete and right before screed and tiling, so it covers all joints and holes. Send a photo of your bathroom so we can check what stage it is at.

Do you offer bitumen bathroom waterproofing in Al Iskan First District?

Yes. Al Iskan First District is within our service area in the Eastern Province, and we also work in Al Jamiyin District, Az Zahrah District and Mansubi Al Taleem First District. Call us or send photos of the spot on WhatsApp.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Jamiyin District, Az Zahrah District and Mansubi Al Taleem First District.

Other services in the area

More services in Al Iskan First District

Pool at night with water jets after waterproofing

Tell us about your site in Al Iskan First District
and we will plan the next step with you

Describe the problem and where it is in Al Iskan First District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp