
Bitumen bathroom waterproofing in Hajr District
Bitumen bathroom waterproofing in Hajr District begins with photos of the bathroom floor and wall bases, sent by call or WhatsApp. The district is residential and lies close to King Faisal University Third, so the work suits both family villas and apartment blocks. Bitumen is laid beneath the screed and tiles, where it protects the structure below from water seeping through.
Residential streets in Hajr mix detached villas with multi-storey apartment buildings, and bathrooms vary in position and age. In apartment blocks the bathroom often sits above another flat, so a leak through the floor can reach the neighbours below. In villas a ground-floor bathroom may sit directly on the base, which makes the wall junctions especially important. The photos show which case applies before any method is chosen.
- Hajr District is a residential district in the Eastern Province, lying close to King Faisal University Third and Al Hizam Al Akhdar District.
- Bathroom floors are waterproofed before the screed because tiles alone do not stop water passing into the structure below.
What we do for you in Hajr District
- Closing the waterproofing around drain openings and pipe entries
- Turning the layer up the walls in the wet zone and sealing the corners
- Checking the concrete floor and wall bases and identifying cracks
- Confirming full drying before the screed is poured
The stages of the work in Hajr District
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Bitumen bathroom waterproofing in Hajr DistrictWe choose the method and the materials once we know the condition of the spot.
Hajr District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in Hajr District
Is bitumen suitable for a bathroom on an upper floor?
Bitumen is often used for bathroom floors and wall bases before screed, and it suits many flats. The photos show the condition of the floor and joints, and we will tell you whether this method fits your bathroom.
What should I send from Hajr District?
Send photos of the bathroom floor, the wall bases and the drain, and tell us whether the bathroom is in a villa or an apartment block. This helps us understand the bathroom before we reply.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Do you cover Hajr District?
Yes. We serve Hajr District and nearby areas such as King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
We also offer it in neighbouring areas
We also offer bitumen bathroom waterproofing in King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District, among the closest areas to Hajr District.
More services in Hajr District




