Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Hajr District

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Hajr District

Bathroom waterproofing before tiling in Hajr District starts with photos of the bathroom floor and wet walls, sent by call or WhatsApp. We serve Hajr District in Al-Ahsa, a residential district close to King Faisal University Third and Al Hizam Al Akhdar District.

Residential streets in Hajr include villas, mid-sized homes and small buildings, and bathrooms there often sit beside kitchens or laundry areas, so water reaches the floor and walls repeatedly. Before tiles go down, a continuous membrane is laid on the floor and on the wet-area walls, which suits most bathrooms of this building type. Whether that is right for your bathroom depends on what the photos and the existing floor show.

  • Hajr District is a residential district in Al-Ahsa in the Eastern Province, lying close to King Faisal University Third and Al Hizam Al Akhdar District.
  • Tiles set on adhesive pass moisture into the concrete beneath, so the membrane goes in before the adhesive.
What the service includes

What we do for you in Hajr District

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

The steps of bathroom waterproofing before tiling in Hajr District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

We serve Hajr District and around itIncluding King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District, as part of our work across the Eastern Province.

Start from Hajr District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Hajr District

Can an older bathroom in Hajr be waterproofed before re-tiling?

Yes, provided the concrete under the old tiles is sound. Damaged layers are removed, cracks are sealed and the membrane goes on before re-tiling; photos show whether the floor needs deeper work.

Do you waterproof shower walls in homes in Hajr District?

Yes, we waterproof the wet-area walls of a bathroom. Send a photo of the wall and shower joint with the existing or new tiling, and we will tell you what your case needs.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

How do I request bathroom waterproofing before tiling in Hajr District?

Call us, or send clear photos of the spot and its location in Hajr District on WhatsApp, and we will work out the next step with you.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

We also offer it in neighbouring areas

We also offer bathroom waterproofing before tiling in King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District, among the closest areas to Hajr District.

Other services in the area

More services in Hajr District

Worker applying the white insulation layer on a villa roof by the sea

In Hajr District and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp