Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Al Qusur

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Al Qusur

In Al Qusur we waterproof bathroom floors and wall bases around the pipe sleeves and drain outlet, beginning with photos sent by call or WhatsApp. Here we handle the waterproofing that comes straight after plumbing and before the tiles.

The buildings here are apartment blocks, small residential buildings and scattered villas, and bathroom ages vary widely. In older buildings the original membrane may have worn away around the sleeves and drain, while newer ones suit treatment before tiling. The photos reveal the actual condition of each bathroom before any method is chosen.

  • Al Qusur is a residential district in Dammam, in the Eastern Province, near Ad Danah Ash Shamaliyah, Al Jamiah and Tihamah.
  • An old membrane most often wears at the edges and sleeves, not across the middle of the floor.
What the service includes

What we do for you in Al Qusur

  • Cleaning and preparing the floor and the wall bases
  • Treating gaps and cracks around pipe sleeves
  • Applying a continuous layer that turns up at the wall bases and the threshold
  • Closing the waterproofing around the drain and the drain outlet
How we work

The steps of bathroom waterproofing after plumbing in Al Qusur

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

The critical points are fully closedSealing pipe sleeves, the drain opening and the corners at this stage cuts off water paths before they are buried under screed and tiles.

Start from Al Qusur with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Al Qusur comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing after plumbing in Al Qusur

Does waterproofing suit older bathrooms in Al Qusur?

It depends on the state of the existing layer and the tile base. Send photos of the floor, walls and sleeves so we can tell you whether treatment is enough or more is needed.

How can I tell if the pipe sleeves in my bathroom need waterproofing?

Damp patches or cracked tiles around the sleeve are a key sign. Send a close photo of that spot and we will advise whether treatment is suitable.

Is Al Qusur within your service area?

Yes, Al Qusur is one of the areas we work in, as are Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah. To start, call us or message us on WhatsApp.

Does the plumber need to be present during the waterproofing?

The plumber does not need to stay throughout, but all pipes must be fixed in place and their sleeves fitted before we start. If any change to the pipework is still pending, it is better to complete it first so the waterproof layer does not have to be redone.

What materials are used for bathroom waterproofing after plumbing?

It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.

Why is the bathroom waterproofed after plumbing and not before?

Because the plumber drills through the concrete slab and opens the walls to run the pipes. Any layer applied before that work is damaged by it. Waterproofing after plumbing means every hole, every pipe sleeve and every drain opening is treated after it is fixed in place, so no gap is left unsealed under the tiles.

Nearby areas

The same service in nearby areas

We also work near Al Qusur, in Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah.

Other services in the area

More services in Al Qusur

Villa roof finished in white insulation with a glass railing over the sea

Tell us about your site in Al Qusur
and we will plan the next step with you

Call us or send us photos of the floor and the pipe sleeves on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp