Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Qusur

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Qusur

We waterproof bathrooms before tiling in Al Qusur once photos of the bathroom and its wet walls arrive by call or WhatsApp. A continuous waterproof membrane is laid on the floor and wet-area walls, before adhesive and tiles, in this district of the Eastern Province.

Buildings in Al Qusur range from standalone houses to multi-storey homes, and bathrooms there are often fairly old and retiled one or more times. Over time grout cracks and tiles loosen around the shower and basin, letting water reach the floor and shared walls. A continuous membrane closes these routes, and the method depends on what the photos show about the base and any older tile layers.

  • Al Qusur is a district in the Eastern Province, close to Ad Danah Ash Shamaliyah, Al Jamiah and Tihamah.
  • Removing old tiles before waterproofing sometimes reveals a damaged floor that needs repair first.
What the service includes

What we do for you in Al Qusur

  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
How we work

The stages of the work in Al Qusur

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Start from Al Qusur with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Qusur is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Qusur

Do we need to remove old tiles before waterproofing in Al Qusur?

It depends on whether the old tiles are loose or cracked. The photos show if waterproofing over them is workable or if removal is needed for the membrane to bond properly.

How is a bathroom with a shared wall handled in Al Qusur?

From the photos we judge how far moisture has travelled into the shared wall and treat the wet areas they show. The final decision rests on the actual condition as the photos reveal it.

Do you cover Al Qusur?

Yes. We serve Al Qusur and nearby areas such as Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

Bathroom waterproofing before tiling near Al Qusur

If the site is outside Al Qusur, the same service is available in Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah.

Other services in the area

More services in Al Qusur

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Qusur?
Call us now

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp