Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Qusur

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Qusur

In Al Qusur we apply bitumen to bathroom floors and wall bases before the screed and tiles. We start from photos you send by call or WhatsApp.

The district's buildings are mid-sized homes and apartment blocks, old and new, with many bathrooms on upper floors. In those cases moisture travels through the joints between floor and wall. Bitumen is brushed onto the floor and wall base before tiling, and its quality depends on how clean the surface is. The photos show whether your bathroom suits this treatment.

  • Al Qusur is a residential district in the Eastern Province, near Ad Danah Ash Shamaliyah, Al Jamiah and Tihamah.
  • The joint between floor and wall is the bathroom spot most prone to seepage over time.
What the service includes

The main items of bitumen bathroom waterproofing in Al Qusur

  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

From first contact to the finished job in Al Qusur

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Qusur comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Qusur is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Qusur

Can a bathroom on an upper floor in Al Qusur be waterproofed?

Yes, it depends on the concrete slab beneath. The photos show the bathroom's position, and if needed we will explain this before starting.

What is the difference between waterproofing a bathroom before and after tiling?

Waterproofing before tiling is easier to apply and more effective. After tiling the surface must be opened, so we prefer to know the current stage from the photos.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Is Al Qusur within your service area?

Yes, Al Qusur is one of the areas we work in, as are Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah. To start, call us or message us on WhatsApp.

Nearby areas

Bitumen bathroom waterproofing near Al Qusur

We also work near Al Qusur, in Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah.

Other services in the area

More services in Al Qusur

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Qusur?
Call us now

Describe the problem and where it is in Al Qusur, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp