Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Al Hadabah

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Al Hadabah

Bathroom waterproofing after plumbing in Al Hadabah begins with a photo of the floor, the wall base and the pipe openings, sent by call or WhatsApp. We serve the district in the Eastern Province, focusing on the floor and wall base around the sleeves and drain outlet.

Al Hadabah is made up of relatively newer homes and mid-sized houses, and many of its bathrooms are finished as part of renovations. New joints settle into the floor and the edge around the sleeves can move over time, so it is checked first. The photos show whether the edge is sound or the joint needs treating before lining.

  • Al Hadabah is a residential district in Al Khobar in the Eastern Province, close to Al Fursan and the airport.
  • The floor edge around sleeves moves as the building settles, so cracks show there first.
What the service includes

What we do for you in Al Hadabah

  • Cleaning and preparing the floor and the wall bases
  • Closing the waterproofing around the drain and the drain outlet
  • Applying a continuous layer that turns up at the wall bases and the threshold
  • Treating gaps and cracks around pipe sleeves
How we work

How we carry out bathroom waterproofing after plumbing in Al Hadabah

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

The critical points are fully closedSealing pipe sleeves, the drain opening and the corners at this stage cuts off water paths before they are buried under screed and tiles.

We serve Al Hadabah and around itIncluding Al Fursan, Al Matar (near An Nabiyah) and Al Iskan Al Shimali, as part of our work across the Eastern Province.

Al Hadabah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing after plumbing in Al Hadabah

Which spots are checked first in a bathroom in Al Hadabah?

The floor edge around the pipe sleeves and drain outlet and the wall base are checked first, since they move most as the building settles.

Does the bathroom need emptying before assessing the waterproofing in Al Hadabah?

A full clearing is not needed. Clear photos of the floor, base and sleeves are enough, and we will tell you anything else needed before starting.

Does the plumber need to be present during the waterproofing?

The plumber does not need to stay throughout, but all pipes must be fixed in place and their sleeves fitted before we start. If any change to the pipework is still pending, it is better to complete it first so the waterproof layer does not have to be redone.

How long should you wait before tiling after the waterproof layer is applied?

The layer needs enough time to dry and cure before anything goes over it. That time varies with the material used and the bathroom conditions, including ventilation and temperature. We tell you when the work is done so the tiling stage is not rushed.

What should I send you from Al Hadabah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Hadabah, and we will work out the next step with you.

What decides the cost of waterproofing at this stage?

The bathroom size, the number of pipe sleeves, the condition of the floor, the amount of gap around the entries and how easily the space can be reached. A large bathroom with many pipe runs differs from a small one. Send us photos and rough dimensions on WhatsApp and we will set the treatment and its cost.

Nearby areas

We also offer it in neighbouring areas

We also offer bathroom waterproofing after plumbing in Al Fursan, Al Matar (near An Nabiyah) and Al Iskan Al Shimali, among the closest areas to Al Hadabah.

Other services in the area

More services in Al Hadabah

Villa roof finished in white insulation with a glass railing over the sea

Tell us about your site in Al Hadabah
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp