Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Hadabah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Hadabah

Bitumen bathroom waterproofing in Al Hadabah, Hofuf, starts with photos of the floor and wall bases, sent by call or WhatsApp. The treatment goes on before the screed and tiling, and its extent is chosen from what the photos show about the floor.

Al Hadabah is made up of houses, villas and small residential compounds, and its bathrooms range from newly laid floors to older ones. In newer bathrooms the treatment is usually preventive, while older ones show damp at joints and drains. What is needed is decided after the photos are reviewed, without assuming anything about any given house.

  • Al Hadabah is a residential district in Hofuf, Al-Ahsa, close to Al Fursan, Al Matar and Al Iskan Al Shimali.
  • Preventive treatment before tiling is simpler than repairing damp once it has reached the walls.
What the service includes

The bitumen bathroom waterproofing work in Al Hadabah

  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
How we work

The stages of the work in Al Hadabah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Al Hadabah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Hadabah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Al Hadabah

Should a new bathroom in Al Hadabah be treated before tiling?

It is advisable, since waterproofing before tiling is easier and more precise than any later repair. Send photos of the floor before tiling and we will explain what is needed.

How is the extent of waterproofing set for an older bathroom in Al Hadabah?

The damaged points are identified from the photos, such as joints, drains and openings, and we then propose covering the whole floor or part of it. The decision depends on what the condition actually shows.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Do you offer bitumen bathroom waterproofing in Al Hadabah?

Yes. Al Hadabah is within our service area in the Eastern Province, and we also work in Al Fursan, Al Matar (near An Nabiyah) and Al Iskan Al Shimali. Call us or send photos of the spot on WhatsApp.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Al Hadabah, the same service is available in Al Fursan, Al Matar (near An Nabiyah) and Al Iskan Al Shimali.

Other services in the area

More services in Al Hadabah

Pool at night with water jets after waterproofing

In Al Hadabah and need bitumen bathroom waterproofing?
Send us photos of the spot

Describe the problem and where it is in Al Hadabah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp