Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Al Badiah

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Al Badiah

Bathroom waterproofing after plumbing in Al Badiah starts with photos of the floor, the wall bases and the drain outlet, sent by call or WhatsApp. The work focuses on the pipe sleeves where lines pass through the floor, since water most often finds its way in at those points first.

Al Badiah is mostly made up of houses and villas, and bathrooms are often added or re-piped inside an existing floor or an extension. Re-plumbing creates new openings in the floor around the pipes, and the tile joints left afterwards may not be fully sealed. The treatment therefore concentrates on those openings, the drain outlet and the wall base, and the photos show how much work is needed. We cannot promise an outcome before we have seen your bathroom.

  • Al Badiah is a district in the Eastern Province, lying close to Al Yaqoot, Al Badrani and Al Iskan.
  • Water from re-plumbed bathrooms most often escapes through pipe openings and drain outlets rather than the middle of the floor.
What the service includes

What we do for you in Al Badiah

  • Treating gaps and cracks around pipe sleeves
  • Applying a continuous layer that turns up at the wall bases and the threshold
  • Cleaning and preparing the floor and the wall bases
  • Leaving the layer to dry and cure before the build continues
How we work

From first contact to the finished job in Al Badiah

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

No tile-lifting laterSuccessful waterproofing at the post-plumbing stage avoids the need to lift tiles and replumb when a leak shows up later.

We serve Al Badiah and around itIncluding Al Yaqoot, Al Badrani and Al Iskan (near Mallahah), as part of our work across the Eastern Province.

Bathroom waterproofing after plumbing in Al BadiahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing after plumbing in Al Badiah

Do new pipes in Al Badiah need separate waterproofing?

It depends on how the pipe was fitted and on the condition of the opening around it. The photos show whether the gap is properly closed, and if not, we agree with you what is needed before the lining goes on.

What should I send first about my bathroom in Al Badiah?

Send clear photos of the bathroom floor, the wall base, the drain outlet and any visible pipes. Tell us if damp shows on the floor below, as that helps us work out where the problem starts.

What materials are used for bathroom waterproofing after plumbing?

It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.

Is Al Badiah within your service area?

Yes, Al Badiah is one of the areas we work in, as are Al Yaqoot, Al Badrani and Al Iskan (near Mallahah). To start, call us or message us on WhatsApp.

Why is the bathroom waterproofed after plumbing and not before?

Because the plumber drills through the concrete slab and opens the walls to run the pipes. Any layer applied before that work is damaged by it. Waterproofing after plumbing means every hole, every pipe sleeve and every drain opening is treated after it is fixed in place, so no gap is left unsealed under the tiles.

Which points are waterproofed at this stage?

The whole floor and the wall bases and the door threshold, with particular care at the pipe sleeves for water supply and drainage, the floor-to-wall corners and around the drain opening. These are the points where water usually escapes when a leak is found under the tiles.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Badiah, in Al Yaqoot, Al Badrani and Al Iskan (near Mallahah).

Other services in the area

More services in Al Badiah

Villa roof finished in white insulation with a glass railing over the sea

We start with you in Al Badiah
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp