Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Industrial Arifi

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Industrial Arifi

In Industrial Arifi we waterproof bathroom floors and wall bases after plumbing work, starting from photos sent by call or WhatsApp. The treatment covers the pipe openings and the drain outlet.

Industrial Arifi holds offices, warehouses, workshops and service facilities, with shared washrooms in heavy daily use. When plumbing is reworked in such spaces the joints between floor and wall and around openings face more stress than in a home bathroom. We start by locating the leak-prone points from the photos, then treat each one accordingly.

  • Industrial Arifi is an industrial and service zone in Dammam in the Eastern Province, near Al Yarmuk and Al Tawyah.
  • Shared washrooms in workplaces see heavy daily use, so their lining is under more strain than home bathrooms.
What the service includes

What the service covers in Industrial Arifi

  • Cleaning and preparing the floor and the wall bases
  • Treating gaps and cracks around pipe sleeves
  • Closing the waterproofing around the drain and the drain outlet
  • Leaving the layer to dry and cure before the build continues
How we work

This is how we work in Industrial Arifi

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

No tile-lifting laterSuccessful waterproofing at the post-plumbing stage avoids the need to lift tiles and replumb when a leak shows up later.

Start from Industrial Arifi with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Industrial Arifi and around itIncluding Al Yarmuk (near Ghizlan), Al Tawyah and Al Dabab (near Ghizlan), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing after plumbing in Industrial Arifi

Do you treat washrooms in industrial premises in Industrial Arifi?

Yes, we treat commercial washrooms and facilities in Industrial Arifi. Send photos of the space and we will agree what heavy use requires.

Why do shared washrooms leak faster than others?

Because they are used heavily all day, the lining and joints take greater strain. We check these points first in the photos.

How long should you wait before tiling after the waterproof layer is applied?

The layer needs enough time to dry and cure before anything goes over it. That time varies with the material used and the bathroom conditions, including ventilation and temperature. We tell you when the work is done so the tiling stage is not rushed.

What materials are used for bathroom waterproofing after plumbing?

It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.

What should I send you from Industrial Arifi?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Industrial Arifi, and we will work out the next step with you.

Which points are waterproofed at this stage?

The whole floor and the wall bases and the door threshold, with particular care at the pipe sleeves for water supply and drainage, the floor-to-wall corners and around the drain opening. These are the points where water usually escapes when a leak is found under the tiles.

Nearby areas

Areas near Industrial Arifi

If the site is outside Industrial Arifi, the same service is available in Al Yarmuk (near Ghizlan), Al Tawyah and Al Dabab (near Ghizlan).

Other services in the area

More services in Industrial Arifi

Villa roof finished in white insulation with a glass railing over the sea

We start with you in Industrial Arifi
with one call

Call us or send us photos of the floor and the pipe sleeves on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp