Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Al Yasmin (near Al Khafji)

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Al Yasmin (near Al Khafji)

We waterproof bathrooms in Al Yasmin after plumbing work, beginning with photos of the floor and wall bases sent by call or WhatsApp. We treat the pipe openings and floor drain in a way suited to each bathroom.

Al Yasmin is mostly villas and mid-sized residential buildings, many built years ago and later re-plumbed. Trouble usually starts where new pipes were routed through old openings and at the join between the floor and the drain. The fix depends on what the photos reveal about the layer beneath the tiles.

  • Al Yasmin is a residential district in the Eastern Province, lying near Al Wurud, Al Khuzama and Al Aziziyah.
  • An opening cut again for a new pipe is the spot most likely to leak after plumbing work.
What the service includes

What the service covers in Al Yasmin (near Al Khafji)

  • Treating gaps and cracks around pipe sleeves
  • Applying a continuous layer that turns up at the wall bases and the threshold
  • Leaving the layer to dry and cure before the build continues
  • Cleaning and preparing the floor and the wall bases
How we work

How we carry out bathroom waterproofing after plumbing in Al Yasmin (near Al Khafji)

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

No tile-lifting laterSuccessful waterproofing at the post-plumbing stage avoids the need to lift tiles and replumb when a leak shows up later.

Al Yasmin (near Al Khafji) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Yasmin (near Al Khafji) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing after plumbing in Al Yasmin (near Al Khafji)

Can an older villa bathroom in Al Yasmin be waterproofed after the pipes are changed?

In most cases yes, provided the concrete floor is sound. The new openings and the drain are treated first, and the photos will tell you if more is needed.

Do you treat bathrooms on upper floors in Al Yasmin?

Yes, we serve Al Yasmin. Tell us in the photos where the bathroom sits in the building, which helps us plan access and the order of work.

Do you cover Al Yasmin (near Al Khafji)?

Yes. We serve Al Yasmin (near Al Khafji) and nearby areas such as Al Wurud (near Al Khafji), Al Khuzama (near Al Khafji) and Al Aziziyah (near Al Khafji), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How long should you wait before tiling after the waterproof layer is applied?

The layer needs enough time to dry and cure before anything goes over it. That time varies with the material used and the bathroom conditions, including ventilation and temperature. We tell you when the work is done so the tiling stage is not rushed.

Why is the bathroom waterproofed after plumbing and not before?

Because the plumber drills through the concrete slab and opens the walls to run the pipes. Any layer applied before that work is damaged by it. Waterproofing after plumbing means every hole, every pipe sleeve and every drain opening is treated after it is fixed in place, so no gap is left unsealed under the tiles.

What materials are used for bathroom waterproofing after plumbing?

It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.

Nearby areas

The same service in nearby areas

We also work near Al Yasmin (near Al Khafji), in Al Wurud (near Al Khafji), Al Khuzama (near Al Khafji) and Al Aziziyah (near Al Khafji).

Other services in the area

More services in Al Yasmin (near Al Khafji)

Villa roof finished in white insulation with a glass railing over the sea

Your first step in Al Yasmin (near Al Khafji):
a call or a WhatsApp message

Call us or send us photos of the floor and the pipe sleeves on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp