Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in At Tahliyah

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in At Tahliyah

We waterproof bathrooms in At Tahliyah after plumbing work, treating the floor and wall bases around the pipes and drain outlet. Send your photos by call or WhatsApp and we will advise what is needed.

At Tahliyah is made up of mid-sized homes and fairly recent residential compounds, and most of its bathrooms are tiled over a concrete floor. When plumbing is reconnected the pipe positions shift, leaving gaps between the pipe and the surrounding layer. We work around those gaps and choose a material suited to the room and its use, and the photos reveal the exact spot.

  • At Tahliyah is a residential district in Dammam in the Eastern Province, close to Al Aziziyah, Al Buhayrah and Ishbiliya.
  • The gap around a pipe sleeve is sometimes smaller than it looks in a photo, so the spot is checked up close.
What the service includes

What we do for you in At Tahliyah

  • Closing the waterproofing around the drain and the drain outlet
  • Treating gaps and cracks around pipe sleeves
  • Treating the floor-to-wall corners with care
  • Cleaning and preparing the floor and the wall bases
How we work

How we carry out bathroom waterproofing after plumbing in At Tahliyah

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

No tile-lifting laterSuccessful waterproofing at the post-plumbing stage avoids the need to lift tiles and replumb when a leak shows up later.

Start from At Tahliyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bathroom waterproofing after plumbing in At TahliyahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing after plumbing in At Tahliyah

Do you waterproof bathrooms in At Tahliyah residential compounds?

Yes, we serve At Tahliyah. Send photos of the bathroom and tell us whether the plumbing positions were changed, as that decides where the check begins.

What happens if the drain outlet has been moved?

The new junction becomes a likely weak point, so we inspect it and treat it before laying the waterproofing around the new position.

Which points are waterproofed at this stage?

The whole floor and the wall bases and the door threshold, with particular care at the pipe sleeves for water supply and drainage, the floor-to-wall corners and around the drain opening. These are the points where water usually escapes when a leak is found under the tiles.

What should I send you from At Tahliyah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in At Tahliyah, and we will work out the next step with you.

Why is the bathroom waterproofed after plumbing and not before?

Because the plumber drills through the concrete slab and opens the walls to run the pipes. Any layer applied before that work is damaged by it. Waterproofing after plumbing means every hole, every pipe sleeve and every drain opening is treated after it is fixed in place, so no gap is left unsealed under the tiles.

Does the plumber need to be present during the waterproofing?

The plumber does not need to stay throughout, but all pipes must be fixed in place and their sleeves fitted before we start. If any change to the pipework is still pending, it is better to complete it first so the waterproof layer does not have to be redone.

Nearby areas

Bathroom waterproofing after plumbing near At Tahliyah

If the site is outside At Tahliyah, the same service is available in Al Aziziyah (near Al Khobar), Al Buhayrah (near Al Khobar) and Ishbiliya.

Other services in the area

More services in At Tahliyah

Villa roof finished in white insulation with a glass railing over the sea

We start with you in At Tahliyah
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp