Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in At Tahliyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in At Tahliyah

In At Tahliyah we bitumen-waterproof bathroom floors and their wall bases, starting from a photo sent by call or WhatsApp. Bitumen comes before the screed and tiles, closing the route for water before it reaches what sits beneath the floor.

At Tahliyah the housing is made up of homes, villas and residential buildings of differing ages and layouts, and its bathrooms range from new to old. Weak protection in a bathroom floor often starts at corners and pipe entries, so those spots receive particular attention when applied. Work before tiling needs a prepared and dry surface as far as possible, and the photos show whether the current floor needs initial preparation.

  • At Tahliyah is a residential district in Dammam, in the Eastern Province, close to Al Aziziyah, Al Buhayrah and Ishbiliya.
  • Damp in floors travels more through joints and corners than across flat areas.
What the service includes

The main items of bitumen bathroom waterproofing in At Tahliyah

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
How we work

The steps of bitumen bathroom waterproofing in At Tahliyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from At Tahliyah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bitumen bathroom waterproofing in At TahliyahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in At Tahliyah

Are bathroom corners in At Tahliyah given special attention?

Yes, corners and pipe entries are where water usually gets through, so we give them particular care during application. Send photos so the sensitive points in your bathroom are clear.

Does the floor in At Tahliyah need preparing before bitumen goes on?

It depends on the current floor's condition, which may need cleaning or initial repair before application. The photos show whether your case calls for any of that.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I request bitumen bathroom waterproofing in At Tahliyah?

Call us, or send clear photos of the spot and its location in At Tahliyah on WhatsApp, and we will work out the next step with you.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Al Aziziyah (near Al Khobar), Al Buhayrah (near Al Khobar) and Ishbiliya.

Other services in the area

More services in At Tahliyah

Pool at night with water jets after waterproofing

We start with you in At Tahliyah
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp