Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ishbiliya

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ishbiliya

Bitumen bathroom waterproofing in Ishbiliya begins with WhatsApp photos of the floor, lower walls, and joints. Ishbiliya is a central residential area mixing modern villas with older houses, where bathrooms suffer from leaks due to pipes and slab water.

Ishbiliya is a mixed residential area with modern villas and older houses, so bathroom age varies widely. Newer villas may have waterproofing, but older houses rarely have bitumen protection under the bathroom. Water from pipe leaks or cracks reaches shared walls and basements. Bitumen is applied over the whole floor and lower walls before tiling to keep moisture out. Photos identify joint locations and any existing cracks.

  • Ishbiliya is a residential district in the Eastern Province, surrounded by areas such as Al Jisr, Al Khawr, and At Tahliyah.
  • Bathrooms in older houses and traditional villas often lack bitumen waterproofing, so water leaks go directly to other layers.
What the service includes

What we do for you in Ishbiliya

  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

This is how we work in Ishbiliya

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Ishbiliya is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Ishbiliya and around itIncluding Al Jisr, Al Khawr and At Tahliyah, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Ishbiliya

Does bitumen fix dampness in older Ishbiliya bathrooms?

Yes, bitumen stops water leaking from the bathroom below. But if the leak is from a broken pipe under the tiles, the pipe must be fixed first. Send photos of the dampness and its location so we can tell whether the leak is from the floor or a pipe.

Do we need to lift the tiles to apply bitumen in our bathroom?

Yes, bitumen goes under the tiles on the floor and lower walls. If tiles are already there, they must be removed first. Photos show the tile condition and the floor underneath to determine the steps.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you offer bitumen bathroom waterproofing in Ishbiliya?

Yes. Ishbiliya is within our service area in the Eastern Province, and we also work in Al Jisr, Al Khawr and At Tahliyah. Call us or send photos of the spot on WhatsApp.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

Areas near Ishbiliya

We also offer bitumen bathroom waterproofing in Al Jisr, Al Khawr and At Tahliyah, among the closest areas to Ishbiliya.

Other services in the area

More services in Ishbiliya

Pool at night with water jets after waterproofing

We start with you in Ishbiliya
with one call

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp