
Bitumen bathroom waterproofing in Al Jisr
Abraj Al Azl provides bitumen bathroom waterproofing in Al Jisr, Al Ahsa, applied before screed and tiling. It starts with a photo of the bathroom floor and wall bases, sent by call or WhatsApp.
Al Jisr contains villas and houses of both older and newer build, and bathrooms are often constructed shortly before the floor is laid. In newer bathrooms the floor and the small channels around the drains are usually the first points where water reaches neighbouring walls. The photos show whether the floor is still exposed or covered by an older layer that needs treatment.
- Al Jisr is a residential district in Al Ahsa Governorate, in the Eastern Province, lying close to Ishbiliya, Al Hamra and Al Khuzama.
- Screed laid over bitumen needs hours to cure, so waterproofing is done before pouring rather than afterwards.
The scope of the work in Al Jisr
- Checking the concrete floor and wall bases and identifying cracks
- Applying bitumen layers over the floor including the shower area
- Closing the waterproofing around drain openings and pipe entries
- Confirming full drying before the screed is poured
The stages of the work in Al Jisr
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Bitumen bathroom waterproofing in Al JisrWe choose the method and the materials once we know the condition of the spot.
Al Jisr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Common questions on bitumen bathroom waterproofing in Al Jisr
Is the bathroom in Al Jisr waterproofed before the tiles go down?
Yes, bitumen is applied to the floor and wall bases before the screed and tiles. Send photos of the bathroom at its current stage so we can confirm whether it is still the right time.
What do the photos reveal for bathrooms in Al Jisr?
The photos show the condition of the floor, drains and the joints between wall and floor, which decide whether treatment is enough or extra work is needed.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Is Al Jisr within your service area?
Yes, Al Jisr is one of the areas we work in, as are Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar). To start, call us or message us on WhatsApp.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
We also offer it in neighbouring areas
If the site is outside Al Jisr, the same service is available in Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar).
More services in Al Jisr




