Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Jisr

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Jisr

Bathroom waterproofing before tiling in Al Jisr begins with photos of the bathroom sent by call or WhatsApp, so we can see the floor and damp walls and decide where the membrane goes. Al Jisr is a residential district of mid-sized homes and small buildings, and correct lining here goes directly beneath the tiles.

The homes in Al Jisr tend to be mid-sized houses and small buildings, and their bathrooms are often fitted on a modest budget. Damp usually shows where the floor meets the wall and around the floor drain, sometimes leaving dark staining in the adhesive over time. The photos show whether lining alone is enough or whether the joints need repair first.

  • Al Jisr is a residential district of Dammam in the Eastern Province, close to Ishbiliya, Al Hamra and Al Khuzama.
  • The floor drain is a common weak point in a bathroom, and its joint with the floor is treated carefully before lining.
What the service includes

What we do for you in Al Jisr

  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

This is how we work in Al Jisr

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Al Jisr is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Jisr and around itIncluding Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar), as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Jisr

In Al Jisr, can tiles go down straight after the membrane is laid?

The membrane needs to dry and cure before adhesive and tiles go on, and the time varies with the product and the weather. We will explain what is needed once we have reviewed the photos.

What problem is most common in bathrooms in Al Jisr?

Moisture most often gets in at the floor-to-wall joint or around the drain, so we start the inspection at those points in every bathroom.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What should I send you from Al Jisr?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jisr, and we will work out the next step with you.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Nearby areas

Areas near Al Jisr

We also offer bathroom waterproofing before tiling in Ishbiliya, Al Hamra (near Al Khobar) and Al Khuzama (near Al Khobar), among the closest areas to Al Jisr.

Other services in the area

More services in Al Jisr

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Al Jisr
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp