Abraj Al AzlContracting
Call العربية
Sealing around pipe penetrations and the floor drain after the plumbing

Bathroom waterproofing after plumbing in Al Bustan (near Ghizlan)

Seal after plumbing

Waterproofing for bathroom floors and wall bases around pipe sleeves and the drain outlet

+966 54 311 2066
The service in your area

Bathroom waterproofing after plumbing in Al Bustan (near Ghizlan)

We waterproof bathroom floors and wall bases after plumbing work in Al Bustan, Jubail, focusing on pipe sleeves and the drain outlet. Send photos of the bathroom by call or WhatsApp and we will decide together what is needed.

The district contains family homes and mid-sized residential buildings, with bathrooms of clearly different ages. Pipes are sometimes run inside interior walls, bringing water close to the wall base at every leak point. The sleeve around each pipe needs careful treatment, and the photos show where the joints lie before a method is chosen.

  • Al Bustan is a residential district in the city of Jubail in the Eastern Province, close to Al Tawyah and Al Merqab.
  • Water leaking inside a wall reaches its base before it shows on the surface.
What the service includes

What the service covers in Al Bustan (near Ghizlan)

  • Applying a continuous layer that turns up at the wall bases and the threshold
  • Cleaning and preparing the floor and the wall bases
  • Leaving the layer to dry and cure before the build continues
  • Treating gaps and cracks around pipe sleeves
How we work

This is how we work in Al Bustan (near Ghizlan)

1

Send photos of the bathroom

Send us photos on WhatsApp of the floor, the pipe sleeves, the drain outlet and the wall bases, so we can see each entry point and corner and decide how each one is treated.

2

Clean and treat the pipe entries

The floor and wall bases are cleaned, and gaps around pipe sleeves, the drain opening and corner junctions are filled with a suitable mortar or adhesive before the waterproof layer goes on.

3

Apply the waterproof layer

The layer covers the floor and turns up at the wall bases and the door threshold, and closes around every pipe and every drain depending on the surface type and the material chosen.

4

Dry, then hand back to the contractor

The layer is left to dry and cure. After that the screed and tiles can go over it, and nothing covers the waterproofing before it has fully set.

What sets us apart

Why Abraj Al Azl?

The critical points are fully closedSealing pipe sleeves, the drain opening and the corners at this stage cuts off water paths before they are buried under screed and tiles.

We serve Al Bustan (near Ghizlan) and around itIncluding Al Tawyah, Al Merqab and Al Jubayl (near Ghizlan), as part of our work across the Eastern Province.

Your request from Al Bustan (near Ghizlan) comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bathroom waterproofing after plumbing in Al Bustan (near Ghizlan)

What is done around a pipe running into the wall in Al Bustan?

The sleeve around the pipe is treated to stop water entering the wall. The photos show how it can be reached, which varies with the wall.

Can waterproofing be done if the plumbing was recently redone in Al Bustan?

Yes, and it is easier before tiling. Send current photos of the bathroom so we can tell whether the work is still possible.

How do I request bathroom waterproofing after plumbing in Al Bustan (near Ghizlan)?

Call us, or send clear photos of the spot and its location in Al Bustan (near Ghizlan) on WhatsApp, and we will work out the next step with you.

How long should you wait before tiling after the waterproof layer is applied?

The layer needs enough time to dry and cure before anything goes over it. That time varies with the material used and the bathroom conditions, including ventilation and temperature. We tell you when the work is done so the tiling stage is not rushed.

Does the plumber need to be present during the waterproofing?

The plumber does not need to stay throughout, but all pipes must be fixed in place and their sleeves fitted before we start. If any change to the pipework is still pending, it is better to complete it first so the waterproof layer does not have to be redone.

What materials are used for bathroom waterproofing after plumbing?

It depends on the surface condition and the location. Cementitious coatings go on floors and wall bases, liquid membranes close corners and around sleeves, and larger gaps are filled with a bonding mortar before the waterproof layer is applied. We decide the right material from the photos.

Nearby areas

Bathroom waterproofing after plumbing near Al Bustan (near Ghizlan)

We also work near Al Bustan (near Ghizlan), in Al Tawyah, Al Merqab and Al Jubayl (near Ghizlan).

Other services in the area

More services in Al Bustan (near Ghizlan)

Villa roof finished in white insulation with a glass railing over the sea

Your first step in Al Bustan (near Ghizlan):
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp