Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in King Faisal University Third

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in King Faisal University Third

Pool waterproofing before tiling in King Faisal University Third begins with photos sent by WhatsApp or call. The district has institutional and residential buildings, some with pools that may be older or newer and need thorough treatment before tiles are laid.

Pools in this district range from newly built to older ones. Newer concrete may only need cleaning and surface preparation, but older concrete typically shows leaks or cracks around corners, joints and pipe entries. Intense heat and natural moisture affect the pool surface, and the photos you send show which treatment method suits your pool's condition before tiling starts.

  • King Faisal University Third is a district in the Eastern Province, close to Hajr District, Sports City and Mansubi Al Taleem First.
  • Pools in institutional and educational district areas may be older and require deeper treatment to prevent leaks.
What the service includes

What the service covers in King Faisal University Third

  • Inspecting the concrete and locating cracks and hairline cracks
  • Cleaning the surface and removing casting residue and dust
  • Treating corners and pour joints with a suitable compound
  • Closing feed and drain pipe inlets and light fitting openings
How we work

From first contact to the finished job in King Faisal University Third

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.

King Faisal University Third is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from King Faisal University Third with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about pool waterproofing before tiling in King Faisal University Third

Can an old pool in King Faisal University Third be waterproofed without demolition?

In many cases yes, if the concrete is sound. We examine the photos first to determine whether there is deep damage that prevents waterproofing, and if the condition is very poor we will tell you so.

What causes pool leaks in this area?

Hairline cracks at joints and corners, untreated pipe entries, and heat stressing the surface. Photos help us pinpoint the exact cause before treatment.

Why is the pool shell waterproofed before tiling and not after?

Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

How long must the waterproof layer cure before tiles go on?

It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.

How do I request pool waterproofing before tiling in King Faisal University Third?

Call us, or send clear photos of the spot and its location in King Faisal University Third on WhatsApp, and we will work out the next step with you.

Nearby areas

Areas near King Faisal University Third

If the site is outside King Faisal University Third, the same service is available in Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District.

Other services in the area

More services in King Faisal University Third

Mosaic-tiled seaside pool

In King Faisal University Third and need pool waterproofing before tiling?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp