
Pool waterproofing before tiling in Hajr District
Pool waterproofing before tiling in Hajr District begins with photos of the shell, its corners and pipe inlets, sent by call or WhatsApp. Hajr is a district in the Eastern Province of houses, villas and apartment buildings, and some homes keep a private pool in the yard.
The mix of houses, villas and apartment buildings in Hajr means pool shells differ in age and in how they were built. In older pools, cracks often appear along construction joints and at pipe entries, and these need treating before any tile goes on. Tight yards mean the pool may sit near walls, so the work area has to be planned in advance. The photos will show whether the surface is ready for treatment.
- Hajr is a district in the Eastern Province, near King Faisal University Third and Al Doha District.
- Pool shells sit exposed to sun and wind, so their tiles are heated and cooled daily, which loads the joints.
The scope of the work in Hajr District
- Closing feed and drain pipe inlets and light fitting openings
- Cleaning the surface and removing casting residue and dust
- Inspecting the concrete and locating cracks and hairline cracks
- Checking the layer is complete before tiling is allowed to begin
This is how we work in Hajr District
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Start from Hajr District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We serve Hajr District and around itIncluding King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing before tiling in Hajr District
Should the pool be dry before waterproofing begins?
The shell must be sound and clean, and the photos help us judge its state. Send pictures of the bare concrete before any tile adhesive is applied, and we will tell you what preparation is needed before the treatment starts.
Can you treat pool inlets near King Faisal University Third?
We serve Hajr District, which lies near King Faisal University Third and Al Hizam Al Akhdar. Send photos of the pipe inlets and joints through WhatsApp, and we will tell you how the work can be planned.
Which tight spots on the pool shell need the most attention?
The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
Do you cover Hajr District?
Yes. We serve Hajr District and nearby areas such as King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Why is the pool shell waterproofed before tiling and not after?
Before tiling, the concrete is fully exposed, so corners, joints and pipe inlets are treated directly and covered by a continuous layer. Once the tiles are on, access to the shell is gone and only the joints and visible surface can be worked. Treating the shell at this early stage is more thorough and more lasting.
The same service in nearby areas
If the site is outside Hajr District, the same service is available in King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District.
More services in Hajr District


