
Pool waterproofing after tiling in Hajr District
We treat leaks in tiled pools in Hajr District in Hofuf, locating the source first and then sealing joints, cracks and fittings. Send photos of the pool by call or WhatsApp so we can see the condition before choosing a method.
Hajr District has villas and detached houses with gardens, and pools there are often set close to outer walls. In a tiled pool a leak usually appears at tile joints and around drain and light fittings. We confirm the source from photos and inspection before treating anything, since what looks like a wall leak can come from a joint.
- Hajr District is a residential district in Hofuf, Al-Ahsa, close to King Faisal University Third and Al Hizam Al Akhdar District.
- Most leaks in tiled pools start at the grout around the tiles rather than in the pool floor itself.
What the service covers in Hajr District
- Closing pump, light and return fittings from inside
- Resealing joints with a flexible water-resistant compound
- Watching the water level after filling to confirm the leak is closed
- Injecting cracks with a compound suited to the concrete shell
From first contact to the finished job in Hajr District
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.
Your request from Hajr District comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from Hajr District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Hajr District
How can I tell if my pool in Hajr District is leaking?
Repeated drop in water level without visible evaporation, or dampness around the edge or the nearby wall, are the main signs. Send photos of the water line and surroundings and we will help you assess it.
Do you treat cracks and joints after tiling a pool in Hajr?
Yes, we treat joints, cracks and fittings after tiling. The approach depends on what the photos show, and we make no promises in advance.
Does the pool have to be emptied before the leak is found?
Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.
Can the pool be used straight after treatment?
No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.
Can a leak at a pump fitting or a light fitting be sealed without lifting tiles?
In many cases yes: the fitting is sealed from inside with a suitable compound without touching the surrounding tiles. If the layer behind those tiles has broken down from accumulated moisture, a small number of tiles around the fitting may have to come up. Send a photo of the fitting area so we can judge.
How do I request pool waterproofing after tiling in Hajr District?
Call us, or send clear photos of the spot and its location in Hajr District on WhatsApp, and we will work out the next step with you.
Pool waterproofing after tiling near Hajr District
We also work near Hajr District, in King Faisal University Third, Al Hizam Al Akhdar District and Al Doha District.
More services in Hajr District


