Abraj Al AzlContracting
Call العربية
Empty garden pool during waterproofing work

Pool waterproofing before tiling in Mansubi Al Taleem First District

The shell, sealed first

Treating the concrete pool shell, its corners, joints and pipe inlets before tile adhesive and tiles go on

+966 54 311 2066
The service in your area

Pool waterproofing before tiling in Mansubi Al Taleem First District

Pool waterproofing before tiling in Mansubi Al Taleem First District begins with photos of the basin sent via WhatsApp or call. We treat the concrete, joints, corners and pipe entries before adhesive and tiles are applied. The treatment method depends on the basin's condition and materials.

The district consists of closely-spaced villas and apartment buildings, mostly new. Many villas have small to medium private pools, and some apartment blocks may share communal pools. The concrete in these pools is usually relatively sound, but hairline cracks may appear at joints and corners due to summer heat and the pool's exposure to water and sun in turn. Pipes may be attached directly to the concrete and need special care. Photos show where leaks or weaknesses are before treatment begins.

  • Mansubi Al Taleem First District is a residential district in the Eastern Province, close to Sports City and Mansubi Al Taleem Second District.
  • Small and medium pools often suffer cracks at corners and joints, particularly at pipe entry points.
What the service includes

The pool waterproofing before tiling work in Mansubi Al Taleem First District

  • Cleaning the surface and removing casting residue and dust
  • Applying the waterproof layer across the floor, walls and pool rim
  • Checking the layer is complete before tiling is allowed to begin
  • Closing feed and drain pipe inlets and light fitting openings
How we work

From first contact to the finished job in Mansubi Al Taleem First District

1

Send photos of the pool

On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.

2

Prepare the surface

The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.

3

Apply the waterproof layer

Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.

4

Cure before tiling begins

The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.

What sets us apart

Why Abraj Al Azl?

No need to lift tiles laterTreating the shell before tiling is far simpler than tracing a leak under tiles that are already fixed.

We serve Mansubi Al Taleem First District and around itIncluding Sports City (near Al-Hofuf), Mansubi Al Taleem Second District and Al Iskan First District, as part of our work across the Eastern Province.

Start from Mansubi Al Taleem First District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Indoor mosaic-tiled pool
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Mosaic-tiled seaside pool
Black bitumen membrane laid on a floor around two pipe stubs
Villa roof finished in white insulation with a glass railing over the sea

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on pool waterproofing before tiling in Mansubi Al Taleem First District

What is the best time to treat the pool before tiling in this district?

Treatment can happen any time, but the photos you send help us understand the basin's condition clearly. After treatment and drying, tiling follows. Extreme heat only affects drying speed.

Do sharp pool basin corners need special treatment?

Yes, sharp corners and joints are weak points where water and pressure collect. We give them additional treatment to ensure water does not leak under the new tiles.

Which tight spots on the pool shell need the most attention?

The angle between the floor and the wall, the concrete pour joints, the feed and drain pipe inlets, the light fitting openings, and the base of the pool rim. These spots are most exposed to movement and expansion, and they need specific treatment before the main layer goes on.

Do you cover Mansubi Al Taleem First District?

Yes. We serve Mansubi Al Taleem First District and nearby areas such as Sports City (near Al-Hofuf), Mansubi Al Taleem Second District and Al Iskan First District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What materials are used to waterproof a pool shell before tiling?

Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.

Does the surface have to be dry before the waterproof layer goes on?

It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.

Nearby areas

Pool waterproofing before tiling near Mansubi Al Taleem First District

If the site is outside Mansubi Al Taleem First District, the same service is available in Sports City (near Al-Hofuf), Mansubi Al Taleem Second District and Al Iskan First District.

Other services in the area

More services in Mansubi Al Taleem First District

Mosaic-tiled seaside pool

Tell us about your site in Mansubi Al Taleem First District
and we will plan the next step with you

Describe the problem and where it is in Mansubi Al Taleem First District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp