
Pool waterproofing before tiling in Sports City (near Al-Hofuf)
Pool waterproofing before tiling in Sports City begins with photos of the pool, its corners and its inlets, sent by call or on WhatsApp. The district lies near Mansubi Al Taleem and King Faisal University Third, and mixes villas with multi-storey residential buildings. The photos show whether a pool needs a full new lining or only spot repairs.
Sports City has villas with private pools in their back gardens, along with some apartment blocks that share a pool within their grounds. Pools here face strong sun for long hours, which dries the finish, cracks it and makes the joints move. Before new tiles go on, cracked areas and open joints have to be treated, because bonding onto a moving surface lets water through. The photos show whether the existing finish can be kept.
- Sports City is a district in the Eastern Province, placed near Mansubi Al Taleem and King Faisal University Third.
- Sun-heated pool edges expand and contract daily, which can open hairline cracks at the tile edge.
The main items of pool waterproofing before tiling in Sports City (near Al-Hofuf)
- Treating corners and pour joints with a suitable compound
- Applying the waterproof layer across the floor, walls and pool rim
- Inspecting the concrete and locating cracks and hairline cracks
- Checking the layer is complete before tiling is allowed to begin
This is how we work in Sports City (near Al-Hofuf)
Send photos of the pool
On WhatsApp: photos of the concrete shell, the corners, pipe inlets and joints, so we can read the surface and decide the right treatment before tiling.
Prepare the surface
The shell is cleaned of dust and casting residue, cracks and hairline cracks are treated, and corners and pour joints are prepared with a suitable filler before the waterproof layer is applied.
Apply the waterproof layer
Waterproof layers cover the floor and walls and turn up at the pool rim, with close attention around feed and drain pipe inlets and light fittings, depending on the surface and the chosen material.
Cure before tiling begins
The waterproof layer is left to cure fully, and coverage at corners and tight spots is checked before tile adhesive and tiles begin.
Why Abraj Al Azl?
The concrete is protected from insideThe layer beneath the tiles keeps water from the concrete and the reinforcement, so the shell lasts longer.
Sports City (near Al-Hofuf) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Pool waterproofing before tiling in Sports City (near Al-Hofuf)We choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Sports City (near Al-Hofuf)
Should cracks in a pool shell be fixed before the lining?
Yes, cracks and open joints are usually treated first so the lining has a stable base. How they are treated depends on whether the crack is moving, which the photos and your description help us judge.
Does the pool deck in Sports City need separate treatment?
The deck is treated where it meets the pool shell, since water runs off it into the joints. Send photos of the deck edge and the drain line so we can see how they meet the pool.
How long must the waterproof layer cure before tiles go on?
It varies by material and site conditions. We tell you the time needed when the job is agreed, and we check that curing is complete at the corners and tight spots before the tiling stage begins.
Does the surface have to be dry before the waterproof layer goes on?
It depends on the material. Some cementitious coatings accept a damp concrete surface, while liquid membranes need the surface dry. That is why preparation and cleaning come first and the surface condition is assessed before the material is chosen. Send a photo of the surface on WhatsApp and we will advise.
What materials are used to waterproof a pool shell before tiling?
Flexible cementitious coatings, liquid membranes or a combination of both are typically used, depending on the condition of the concrete and the shape of the shell. Corners and joints are sometimes treated with an adhesive compound or a reinforcing strip before the main layer. We decide the right material after seeing the photos.
What should I send you from Sports City (near Al-Hofuf)?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Sports City (near Al-Hofuf), and we will work out the next step with you.
Pool waterproofing before tiling near Sports City (near Al-Hofuf)
We also offer pool waterproofing before tiling in Mansubi Al Taleem Second District, Mansubi Al Taleem First District and King Faisal University Third, among the closest areas to Sports City (near Al-Hofuf).
More services in Sports City (near Al-Hofuf)


