
Foundation waterproofing in King Faisal University Third
Foundation waterproofing at King Faisal University Third begins with a photo of the leak or damp, sent by call or WhatsApp. The area has administrative and residential buildings of varying age, whose foundations need protection from soil moisture and water seeping into below-ground walls.
Buildings in the area range from administrative to residential to service buildings, with many recently built but some older. New foundations may need lining renewal, while older ones often face leaks from cracks and joints around pipes and basement entries. Below-ground walls are subject to persistent ground moisture, and water may collect after rain in low-lying spots. Intense heat and moderate humidity affect waterproofing durability over time. Photos establish the leak extent and damage before deciding on treatment.
- King Faisal University Third is in the Eastern Province, near Hajr District, Sports City and Mansubi Al Taleem First District.
- Administrative and residential buildings typically have basements or below-ground walls directly exposed to ground water pressure.
What we do for you in King Faisal University Third
- Treating cracks, pipe openings and joints before waterproofing
- Fixing protection boards over the waterproof layer before backfill
- Checking layer continuity at corners, edges and critical points
- Applying the waterproof layer in bitumen rolls or bitumen coating according to the surface
The stages of the work in King Faisal University Third
Send site photos
On WhatsApp: photos of the exposed walls or the indoor damp patches and the base, so we can read the situation and decide the right treatment.
Prepare the surface
The concrete walls are cleaned of dust, oil and anything loose, and cracks, joints and pipe openings are treated before any waterproof layer, because these are where water enters first.
Apply the waterproof layer
Bitumen rolls, a bitumen coating or the appropriate membrane are applied to the wall and the footing in continuous layers that rise above the backfill level and extend to the base of the foundation, according to what the surface calls for.
Protection boards then backfill
Protection boards are fixed over the waterproof layer to guard it from soil friction and backfill damage, then the site is backfilled once the layer has dried and set.
Why Abraj Al Azl?
No excavation after the buildProper waterproofing during construction avoids costly later excavation to reach the wall from outside.
We serve King Faisal University Third and around itIncluding Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District, as part of our work across the Eastern Province.
King Faisal University Third is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in King Faisal University Third
Does waterproofing a foundation in an administrative building differ from a residential one?
It depends on the structure and subsurface location, not on building type. Both need protection from damp and leaks, and the method is determined by photos and inspection, not by use.
Do rare rains in the area affect building foundations?
Yes. Heavy rains, though rare, increase water around the foundation and may reveal previously hidden leaks. Water pools in low areas and presses on below-ground walls, so waterproofing must withstand this sudden pressure.
Do you cover King Faisal University Third?
Yes. We serve King Faisal University Third and nearby areas such as Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Why do cracks and joints need special treatment before waterproofing?
Cracks, joints and pipe openings are the weakest points in a concrete wall against water. If the waterproof layer is applied over them without treatment it will crack in time and let water through. They are filled and treated first so the waterproof layer has a sound base.
What materials are used in foundation waterproofing?
Common materials include torch-on or self-adhesive bitumen rolls, cold bitumen coating, and composite membranes, together with protection boards that shield the layer from soil pressure and backfill. The material choice depends on the wall, the soil conditions and the depth of the foundation.
Is the waterproof layer affected by salty soil?
Soil contains salts and sulphates that attack unprotected concrete. The waterproof layer is therefore chosen to resist those salts, and protection boards are added to stop the soil reaching the layer directly. We confirm the right materials once we know the site conditions.
We also offer it in neighbouring areas
If the site is outside King Faisal University Third, the same service is available in Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District.
More services in King Faisal University Third



