Abraj Al AzlContracting
Call العربية
Worker heat-welding a seam of light grey PVC membrane on a roof

PVC membrane waterproofing in King Faisal University Third

No exposed seams

PVC sheet waterproofing for roofs and tanks, with sealed edges and penetrations throughout

+966 54 311 2066
The service in your area

PVC membrane waterproofing in King Faisal University Third

PVC membrane waterproofing in King Faisal University Third district starts with WhatsApp photos of the roof or tank and its surroundings. The district has modern institutional and residential buildings requiring high protection against water leaks and heat.

The district has relatively modern buildings, including university and residential structures with varied roof designs and waterproofing systems. Some roofs are completely flat, others have structural elements, tanks and mechanical equipment. PVC membranes offer comprehensive protection with tightly sealed joints around all penetrations. Intense heat and coastal humidity demand high-quality installation and sealing. The photos show the current design and condition and determine the best method for this type of building.

  • King Faisal University Third is a district in the Eastern Province, close to Hajr District, Sports City and Mansubi Al Taleem First District, with modern institutional and residential buildings.
  • Modern institutional and residential buildings have complex roofs with multiple fixtures, increasing the number of joints requiring precise sealing.
What the service includes

The main items of PVC membrane waterproofing in King Faisal University Third

  • Laying PVC sheets and fixing them by the method that suits the site
  • Sealing the layer at the parapet, AC bases and all penetrations
  • Cleaning the surface and treating cracks and joints before laying
  • Adding a protection layer over the membrane on exposed roofs
How we work

The stages of the work in King Faisal University Third

1

Send photos of the roof or tank

On WhatsApp: photos of the full roof, the parapet, AC bases, pipe openings and drains, so we can assess the surface and decide the right fixing method and treatment.

2

Prepare the surface

The concrete slab is cleaned and cracks and joints are treated; old insulation is removed where its condition does not allow installation over it, and the surface is left to dry before any further step.

3

Lay the sheets and weld the seams

PVC sheets are laid across the surface and fixed by the method that suits the position; seams between sheets are welded with hot air, and the layer is turned up at the parapet and around penetrations.

4

Check the seams and add the protection layer

Welded seams are checked for continuity, then a protection layer or ballast is added over the membrane on exposed roofs so the PVC is kept from direct sun and foot traffic.

What sets us apart

Why Abraj Al Azl?

The seam disappears in the weldHeat welding fuses the two sheet edges into one layer, so no exposed edge remains for water to get through.

King Faisal University Third is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve King Faisal University Third and around itIncluding Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on PVC membrane waterproofing in King Faisal University Third

Do PVC membranes suit complex roofs in university buildings?

Yes, but complex roofs with many elements need careful assessment. Send comprehensive photos from different angles so we can determine how many seams and penetrations need sealing.

How are tanks and fixtures on institutional building roofs waterproofed?

PVC membranes are tightly sealed around each tank and mechanical fixture using tight, waterproof seams. Photos determine the location and size of each element to design the right sealing method.

Do PVC sheets need a protection layer on top?

On roofs exposed to sun and foot traffic, a protection layer goes over the PVC, such as ballast, gravel or protection boards, to extend the membrane's life and shield it from mechanical wear and ultraviolet light. For tanks and pools the need is assessed by use.

What is the difference between PVC sheets and bitumen rolls for roof waterproofing?

Bitumen rolls are usually torch-applied and are stiffer, while PVC sheets are lighter, more flexible and their seams are welded with hot air rather than a flame. Each suits different situations; send photos of the roof so we can advise which fits.

Is King Faisal University Third within your service area?

Yes, King Faisal University Third is one of the areas we work in, as are Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District. To start, call us or message us on WhatsApp.

How are PVC sheets sealed around AC bases and pipe penetrations?

At each penetration the sheet is cut closely and welded around it with shaped PVC pieces, so no open edge remains. These points are the most common source of roof leaks, so they receive careful attention before moving on to the protection layer.

Nearby areas

We also offer it in neighbouring areas

We also offer PVC membrane waterproofing in Hajr District, Sports City (near Al-Hofuf) and Mansubi Al Taleem First District, among the closest areas to King Faisal University Third.

Other services in the area

More services in King Faisal University Third

Villa roof finished in white insulation with a glass railing over the sea

Tell us about your site in King Faisal University Third
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp