Abraj Al AzlContracting
Call العربية
Worker rolling epoxy on a concrete floor in a wet area

Epoxy waterproofing in Third Industrial Area

Epoxy bonds, it does not float

Epoxy waterproofing for tanks, pools, floors and wet rooms, with surface preparation, crack treatment and continuous resin layers

+966 54 311 2066
The service in your area

Epoxy waterproofing in Third Industrial Area

Epoxy waterproofing in the Third Industrial Area starts with a photo of the tank, floor or basin, sent by call or WhatsApp. Industrial buildings call for durable layers that resist traffic and light chemical exposure.

The area holds warehouses, factories and service facilities, many with water tanks, basins and floors carrying vehicle traffic. Industrial floors wear at joints and around columns, so those points are treated before the resin goes down. The thickness and material depend on how the space is used, and the photos show what is needed specifically.

  • The Third Industrial Area lies in Yanbu, near the Second Industrial Area and Al Fasl.
  • Floors crossed by vehicles need a thicker layer than those used only on foot.
What the service includes

What the service covers in Third Industrial Area

  • Leaving the layer to cure fully before the tank or pool is returned to use
  • Emptying the tank or pool and waiting for the surface to dry fully
  • Treating hairline cracks and joints before the resin is applied
  • Cleaning the surface, removing old coatings and roughening it
How we work

The steps of epoxy waterproofing in Third Industrial Area

1

Send photos of the surface

On WhatsApp: photos inside the tank, the pool or on the floor, showing the cracks, joints and anywhere the leak shows, so we can decide the right treatment.

2

Dry and prepare the surface

The tank or pool is emptied completely and the surface is left to dry, because epoxy does not bond to damp concrete. The surface is cleaned of dirt and old coatings, then roughened or treated to open the concrete pores.

3

Treat cracks and joints

Hairline cracks are opened slightly and cleaned, then filled with a suitable material before the resin goes on, because the layer alone does not bridge moving or wide cracks.

4

Apply the resin layers and let them cure

The two epoxy parts are mixed and successive layers are applied, each left to cure before the next, with particular care at corners, joints and drain outlets.

What sets us apart

Why Abraj Al Azl?

Bonded, not floatingEpoxy bonds into the concrete rather than sitting on top, which makes it hard for water pressure from inside to push it off.

Epoxy waterproofing in Third Industrial AreaWe choose the method and the materials once we know the condition of the spot.

We serve Third Industrial Area and around itIncluding Second Industrial Area, Al Fasl and Industrial Area, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about epoxy waterproofing in Third Industrial Area

Can epoxy handle vehicle traffic in the Third Industrial Area?

It handles a good deal of traffic when the surface is prepared and the layers are sized for the use. We confirm this after reviewing the photos and knowing the expected traffic.

Do you treat industrial tanks in this area?

Yes, we serve the Third Industrial Area. Send photos of the tank and tell us if it holds anything other than water, so we can choose the right material.

What decides the cost of epoxy waterproofing?

The area to be treated, its condition in terms of cracks, dirt and old coatings, how easily the site can be reached, and whether cracks need work before the resin goes on. Send photos with rough dimensions on WhatsApp and we will explain what the treatment covers.

Why must the surface be completely dry before epoxy is applied?

Epoxy is a chemical resin that needs to react with the concrete, not with water. Moisture in the concrete prevents full adhesion and can cause the layer to blister or separate later. That is why tanks are emptied and the surface is left to dry before work begins.

What should I send you from Third Industrial Area?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Third Industrial Area, and we will work out the next step with you.

How do I know if an old epoxy layer needs renewing?

Signs that renewal is due include blisters or bubbles on the surface, sections that have separated or are lifting, leaks returning through the layer, and unusual discolouration or roughness. If you notice any of these, send photos on WhatsApp and we will assess the condition.

Nearby areas

Epoxy waterproofing near Third Industrial Area

If the site is outside Third Industrial Area, the same service is available in Second Industrial Area, Al Fasl and Industrial Area.

Other services in the area

More services in Third Industrial Area

Worker rolling the white insulation layer onto a roof

In Third Industrial Area and need epoxy waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp