
Waterproofing in Third Industrial Area
We provide waterproofing and thermal insulation for the roofs of industrial premises in the Third Industrial Area, starting from photos sent by call or WhatsApp. The area lies near the Second Industrial Area and Al Fasl, and its buildings need solutions suited to their wide roof spans.
The area contains industrial premises with wide, flat roofs that take the full force of sun and seasonal change. Cracks can appear at the joints of metal and concrete roofs, and water may pool in small low spots on the surface. The choice of method depends on the roof type and the size of the premises, which is settled once the photos have been reviewed.
- The Third Industrial Area is an industrial zone in the Eastern Province, lying near the Second Industrial Area and Al Fasl.
- Wide flat industrial roofs usually need good drainage so that water does not sit on the surface.
The waterproofing work in Third Industrial Area
- Cleaning the surface and treating cracks, edges and AC bases
- Laying a continuous layer that turns up at the walls and closes at every opening
- Choosing the right material for each location from cementitious coat, bitumen rolls, liquid membrane and epoxy
- Respecting the correct curing time for each material before the finish goes on
The stages of the work in Third Industrial Area
Send photos of the problem
On WhatsApp: photos of the roof, wall, tank or bathroom with any visible stain or crack, so we can read the surface and point to the right material family.
Prepare the surface
The surface is cleaned of dust, oil and any old coating, and cracks, joints, drain openings and AC bases are treated, because any point left untreated becomes a future entry point for water.
Apply the waterproof layer
The chosen material goes on according to the surface type, whether liquid, membrane rolls, cementitious coating or epoxy, and is turned up at the walls and closed at every opening, joint and edge.
Cure, then finish
The layer is left to cure according to its type, then tiles or a protective coating go over it to shield it from sun and wear, and each material has its own curing requirement which we follow.
Why Abraj Al Azl?
The material fits the settingA tank needs a cementitious coat or epoxy, an exposed roof needs bitumen rolls or polyurethane, and using the wrong material undoes the work.
We serve Third Industrial Area and around itIncluding Second Industrial Area, Al Fasl and Industrial Area, as part of our work across the Eastern Province.
Your request from Third Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on waterproofing in Third Industrial Area
Do you insulate industrial roofs in the Third Industrial Area?
Yes, we serve the Third Industrial Area. Send photos of the roof and its size, and we will work out with you whether waterproofing, thermal insulation or both suit it.
What causes water to leak through wide industrial roofs?
Usually it is cracks at joints and low spots where water collects, along with repeated movement of the materials. The photos usually show exactly where the problem lies.
How do I request waterproofing in Third Industrial Area?
Call us, or send clear photos of the spot and its location in Third Industrial Area on WhatsApp, and we will work out the next step with you.
Can waterproofing go over old tiles or must they be lifted?
It depends on the condition of the tiles and where the leak is coming from. If the tiles are firm and the joints are sound, treating from above may be enough. If tiles are loose or the leak is beneath them, they are lifted, the surface is waterproofed and everything is relaid. Photos settle the question before the work starts.
Which signs of a leak call for waterproofing assessment?
A damp patch spreading on the ceiling or the wall, white salt appearing on the concrete, tiles or render peeling away, blistering in an old waterproof layer, and a damp smell in a closed room: all of these mean water is moving inside the wall or the slab and needs attention before it reaches the reinforcement.
What decides the cost of waterproofing a building?
The total area of each location to be treated, the condition and depth of any damage, the material type each surface needs, the number of cracks and joints requiring prior treatment, and ease of access. Send photos of every location on WhatsApp and the scope of the work becomes clear.
We also offer it in neighbouring areas
We also offer waterproofing in Second Industrial Area, Al Fasl and Industrial Area, among the closest areas to Third Industrial Area.
More services in Third Industrial Area


