Abraj Al AzlContracting
Call العربية
Round water tank lined in blue inside, with a float in the middle

Water tank waterproofing in Third Industrial Area

Your tank is losing water

Waterproofing for ground, overhead and concrete tanks, from inside or outside

+966 54 311 2066
The service in your area

Water tank waterproofing in Third Industrial Area

We waterproof water tanks in the Third Industrial Area of the Eastern Province, from inside or outside, starting with photos of the tank and its surroundings sent by call or WhatsApp. It borders the Second Industrial Area and Al Fasl, and is home to many warehouses and workshops.

The area holds warehouses, facilities and workshops, and its tanks are often large and placed on the ground or on wide roofs. Exposed tanks face strong sun and sometimes vibration from nearby equipment, which can affect joints and bases. The size of the tank and the type of building shape the right method, and the photos clarify this before work starts.

  • The Third Industrial Area is in the Eastern Province, next to the Second Industrial Area and Al Fasl.
  • Large tanks need a uniform lining at joints, since any small gap widens over time.
What the service includes

The main items of water tank waterproofing in Third Industrial Area

  • Sealing joints and pipe entries before the lining is applied
  • Checking the surface once dry before the tank is refilled
  • Inspecting the tank inside and outside and locating the leak source
  • Treating hairline cracks and deeper cracks separately
How we work

From first contact to the finished job in Third Industrial Area

1

Send photos of the tank

On WhatsApp: photos of the tank from inside and outside, the damp patches, and the pipes and their entry points, so we can read the leak and decide the right treatment.

2

Empty and clean the surface

The tank is emptied and the surface is cleaned of deposits and scale. It is then dried or left damp depending on the lining chosen, because adhesion starts with a clean surface.

3

Treat cracks, joints and pipe entries

Hairline cracks and deeper cracks are treated separately, the joints between the walls and the floor are sealed, and the pipe entries are closed before the main waterproof layer goes on.

4

Apply the lining and allow it to cure

The waterproof layer is applied to the inside, the outside or both faces depending on the situation, then left to cure fully before the tank is refilled.

What sets us apart

Why Abraj Al Azl?

The walls and soil stay dryWaterproofing the outside face protects the neighbouring walls and the soil from the moisture that would otherwise work its way to the reinforcement.

Your request from Third Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.

Water tank waterproofing in Third Industrial AreaWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about water tank waterproofing in Third Industrial Area

Do you waterproof large tanks for warehouses in the Third Industrial Area?

Yes, we serve the area. Send photos of the tank, its estimated size and where it stands, and tell us whether it sits on the ground or the roof so we can choose the right method.

Does nearby equipment affect a tank's waterproofing in the industrial zone?

Vibration can affect joints and bases over time, so we check the base and joints in the photos. If clear movement shows, we will say so before choosing a lining.

How do I request water tank waterproofing in Third Industrial Area?

Call us, or send clear photos of the spot and its location in Third Industrial Area on WhatsApp, and we will work out the next step with you.

What is the difference between a cementitious coating and epoxy for a tank?

A cementitious coating is a mineral material brushed or trowelled on and cured with surface moisture. It suits damp concrete. Epoxy is a two-part resin applied to a clean, dry surface to give a hard, smooth lining. The choice depends on the surface condition, how much moisture is present and the nature of the leak. Photos help us decide which fits.

What decides the cost of waterproofing a tank?

The tank size, how many faces need treating, the surface type and condition, the depth of the cracks, which lining material suits the situation, and how easily the tank can be reached. Send photos and rough dimensions on WhatsApp and we will set out the right treatment.

What are the signs of a leak in a concrete tank?

A falling water level with no consumption that explains it, damp patches on the outer walls or the surrounding floor, cracks or white salt deposits on the concrete surface, and sometimes a faint dripping sound. The earlier the treatment the less it costs the structure as a whole.

Nearby areas

The same service in nearby areas

We also offer water tank waterproofing in Second Industrial Area, Al Fasl and Industrial Area, among the closest areas to Third Industrial Area.

Other services in the area

More services in Third Industrial Area

Two workers in high-visibility vests insulating a roof beside the AC units

Water tank waterproofing in Third Industrial Area?
Call us now

Describe the problem and where it is in Third Industrial Area, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp