
Tanks & roofs together in Third Industrial Area
We provide tank and roof waterproofing for buildings in the Third Industrial Area, starting with photos of the tank, its stand and the surrounding roof, sent by call or WhatsApp. The photos help us understand the building type and the roof's condition before scoping the work.
The area has warehouses, plants and operational buildings with wide, nearly flat roofs, and the overhead tank often sits on an exposed roof with nothing shading it. Seepage usually concentrates at pipe joints and tank entries, and along edges and drainage outlets on large roofs. The photos show whether the problem is local or needs the whole roof treated.
- The Third Industrial Area is an industrial zone in Jubail in the Eastern Province, next to the Second Industrial Area and Al Fasl.
- Wide exposed roofs take intense heat, so keeping the protective layer intact at the edges matters as much as the surface area.
The scope of the work in Third Industrial Area
- Extending the waterproof layer across the roof surrounding the tank
- Sealing pipe entries, the AC base, drain openings and the parapet
- Checking the tank base, the surrounding slab and locating the leak points
- Lining the tank with a layer suited to its type and condition
The stages of the work in Third Industrial Area
Send photos of the tank and roof
On WhatsApp: photos of the tank, its stand, the pipe entries, the surrounding roof and any stains, so we can read what each point needs and set the scope of the work.
Inspect and prepare
The tank base and the surrounding slab are checked, surfaces are cleaned of dust and deposits, and cracks, joints and drain openings are treated before any waterproof layer is applied.
Waterproof the tank, then the roof around it
The tank is lined on the inside with a layer suited to its type and condition, then the waterproof layer extends across the surrounding roof, turns up at the AC base, the parapet and every pipe entry, forming one connected waterproof surface.
Cure and hand over
The layers are left to dry and harden, and the seal at the tank base, pipe entries and drain openings is checked before the tank is put back in use.
Why Abraj Al Azl?
One weak point brings the leak backTreating the tank and its surroundings together reduces the chance of water finding a way through the edges after the work is done.
Your request from Third Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.
Tanks & roofs together in Third Industrial AreaWe choose the method and the materials once we know the condition of the spot.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Before you book tanks & roofs together in Third Industrial Area
Do you treat wide roofs for facilities in the Third Industrial Area?
Yes, we treat wide roofs alongside tanks. Send photos of the full roof, its edges and the tank, and we will agree with you whether the treatment is local or complete.
What causes seepage around the tank in the Third Industrial Area?
Seepage most often starts at pipe joints, the base of the stand and roof edges, where expansion and contraction open the joints over time. The photos reveal the sources before any lining is applied.
What decides the cost of waterproofing the tank and the roof together?
The tank size, the number of floors, the slab condition, the existing cracks, how much of the roof needs treatment, the number of pipe entries and how easily the roof can be reached. Send photos and rough dimensions on WhatsApp and we will set the scope.
Does the tank need to be empty before the work starts?
Yes. The inside walls cannot be cleaned, cracks treated or a waterproof layer applied while the tank is full. The tank is emptied and cleaned before the work starts, and refilled once the layers have dried and set. We agree the timing of emptying in advance.
Is Third Industrial Area within your service area?
Yes, Third Industrial Area is one of the areas we work in, as are Second Industrial Area, Al Fasl and Industrial Area. To start, call us or message us on WhatsApp.
Is the same material used on the tank and on the roof?
Not necessarily. The tank needs a layer that withstands constant water contact and bonds well to concrete or fibreglass, while the surrounding roof needs a layer that handles sun and thermal movement. We choose the right material for each point based on the photos and the surface condition.
We also offer it in neighbouring areas
We also offer tanks & roofs together in Second Industrial Area, Al Fasl and Industrial Area, among the closest areas to Third Industrial Area.
More services in Third Industrial Area




