
Tanks & roofs together in Second Industrial Area
Tank and roof waterproofing in the Second Industrial Area covers overhead tanks, their stands, pipe entries and the wide roof around them. Send photos of the tank and roof by call or WhatsApp, and we will look at the joints together before any method is proposed. We serve the Second Industrial Area in the Eastern Province.
The Second Industrial Area is built mainly from warehouses, workshops and light production sheds, often with wide flat roofs. Their water tanks usually sit on steel or concrete stands, and many pipes can cross a single roof. Repeated foot traffic and equipment on the roof can crack a surface that was sound at first. Because the roofs are large, the photos help us decide which sections need work and which can be left as they are.
- The Second Industrial Area is a district in the Eastern Province, close to the First and Third Industrial Areas.
- Large flat roofs drain rain across wide areas, so outlets and roof edges need as much attention as the tank.
The scope of the work in Second Industrial Area
- Cleaning the tank inside and treating cracks and joints
- Lining the tank with a layer suited to its type and condition
- Checking the tank base, the surrounding slab and locating the leak points
- Extending the waterproof layer across the roof surrounding the tank
From first contact to the finished job in Second Industrial Area
Send photos of the tank and roof
On WhatsApp: photos of the tank, its stand, the pipe entries, the surrounding roof and any stains, so we can read what each point needs and set the scope of the work.
Inspect and prepare
The tank base and the surrounding slab are checked, surfaces are cleaned of dust and deposits, and cracks, joints and drain openings are treated before any waterproof layer is applied.
Waterproof the tank, then the roof around it
The tank is lined on the inside with a layer suited to its type and condition, then the waterproof layer extends across the surrounding roof, turns up at the AC base, the parapet and every pipe entry, forming one connected waterproof surface.
Cure and hand over
The layers are left to dry and harden, and the seal at the tank base, pipe entries and drain openings is checked before the tank is put back in use.
Why Abraj Al Azl?
One weak point brings the leak backTreating the tank and its surroundings together reduces the chance of water finding a way through the edges after the work is done.
Your request from Second Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Second Industrial Area and around itIncluding First Industrial Area, Third Industrial Area and Industrial Area, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Questions about tanks & roofs together in Second Industrial Area
Do you waterproof wide warehouse roofs in this area?
Yes, we serve this area. Send photos of the whole roof and the tank, and the images will show which sections need treatment and which are sound.
Can a tank stand be treated while the roof stays in use?
This depends on the building and the access. Tell us how the roof is used, and the photos will help us plan the order of work around your activity.
Why does water leak from the tank base rather than through the tank wall?
The tank base joins two different materials, the tank body and the concrete slab, and the joint between them is the weakest point because each expands and contracts at a different rate with the heat. Pipe entries also form holes in the concrete that are often missed when the tank is treated alone. Photos help us find the exact point.
Is Second Industrial Area within your service area?
Yes, Second Industrial Area is one of the areas we work in, as are First Industrial Area, Third Industrial Area and Industrial Area. To start, call us or message us on WhatsApp.
Does the tank need to be empty before the work starts?
Yes. The inside walls cannot be cleaned, cracks treated or a waterproof layer applied while the tank is full. The tank is emptied and cleaned before the work starts, and refilled once the layers have dried and set. We agree the timing of emptying in advance.
Which points on the roof around the tank are waterproofed?
The slab surrounding the tank base is waterproofed and the layer turns up at the tank wall. Supply and drain pipe entries are sealed, and the AC base, drain openings and parapet are treated depending on their condition and how close they are to the tank. The roof work completes the tank waterproofing; it does not replace it.
The same service in nearby areas
Nearby areas we also cover: First Industrial Area, Third Industrial Area and Industrial Area.
More services in Second Industrial Area




