
Waterproofing in Second Industrial Area
We handle waterproofing and thermal insulation for roofs, tanks and metal decks in the Second Industrial Area, starting from photos sent by call or WhatsApp. The area sits near the First and Third Industrial Areas in the Eastern Province.
The industrial area is made up of buildings with wide flat roofs, many of them large metal or concrete structures exposed to intense heat through the day. In these buildings the joints between panels, drains and openings are usually the weak points, and their size and type vary from one building to another. The photos show the condition and type of roof before the insulation or waterproofing method is chosen.
- The Second Industrial Area is an industrial zone in the Eastern Province, near the First and Third Industrial Areas, with buildings that have wide roofs.
- Large metal roofs expand in heat and contract at night, so their joints weaken before anything else.
The waterproofing work in Second Industrial Area
- Cleaning the surface and treating cracks, edges and AC bases
- Checking the surface and finding the entry points: cracks, joints and openings
- Respecting the correct curing time for each material before the finish goes on
- Choosing the right material for each location from cementitious coat, bitumen rolls, liquid membrane and epoxy
The stages of the work in Second Industrial Area
Send photos of the problem
On WhatsApp: photos of the roof, wall, tank or bathroom with any visible stain or crack, so we can read the surface and point to the right material family.
Prepare the surface
The surface is cleaned of dust, oil and any old coating, and cracks, joints, drain openings and AC bases are treated, because any point left untreated becomes a future entry point for water.
Apply the waterproof layer
The chosen material goes on according to the surface type, whether liquid, membrane rolls, cementitious coating or epoxy, and is turned up at the walls and closed at every opening, joint and edge.
Cure, then finish
The layer is left to cure according to its type, then tiles or a protective coating go over it to shield it from sun and wear, and each material has its own curing requirement which we follow.
Why Abraj Al Azl?
Treatment at the source, not the symptomPainting over the stain does not stop the water; treating the entry points is what stops it.
Your request from Second Industrial Area comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Second Industrial Area and around itIncluding First Industrial Area, Third Industrial Area and Industrial Area, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Second Industrial Area
Can a metal roof in the Second Industrial Area be thermally insulated?
Often yes, as the roof can be given a layer that reduces heat passing indoors. We pick the right method after reviewing the roof type and joint condition in the photos.
What does leakage in industrial roofs usually reveal?
It is usually at joints, openings or around drains rather than the middle of the roof. Clear photos of the location help pinpoint the spot before any work.
How do I request waterproofing in Second Industrial Area?
Call us, or send clear photos of the spot and its location in Second Industrial Area on WhatsApp, and we will work out the next step with you.
Can waterproofing go over old tiles or must they be lifted?
It depends on the condition of the tiles and where the leak is coming from. If the tiles are firm and the joints are sound, treating from above may be enough. If tiles are loose or the leak is beneath them, they are lifted, the surface is waterproofed and everything is relaid. Photos settle the question before the work starts.
What does full-building waterproofing cover in a single project?
Each location is treated with the material suited to it: the roof with its rolls or liquid coat, the tank with its cementitious or epoxy lining, the bathrooms and kitchens with a coat that closes the wall, the floor and the angles. We set out what is treated once we see photos of the whole building.
Is waterproofing different from treating damp inside a wall?
Yes. Waterproofing is applied to the surface to stop water pushing through in the first place. Treating damp deals with water that has already entered the wall: the area is dried, salts are treated and the render is restored before a waterproof layer goes on to prevent it returning. Photos show which approach the situation needs.
The same service in nearby areas
If the site is outside Second Industrial Area, the same service is available in First Industrial Area, Third Industrial Area and Industrial Area.
More services in Second Industrial Area


