Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Qusur

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Qusur

We apply epoxy tank lining in Al Qusur in Al Khobar, starting with photos of the tank's interior sent by call or WhatsApp. The walls and floor are coated with resin that seals the pores and cracks through which water leaks out of the concrete.

The area is made up of homes of varying size, including older houses with their original concrete tanks and newer ones. Old concrete soaks up water and shows seepage at corners and around pipe openings, whereas a newer tank usually needs only a renewal coat. The photos establish each tank's condition before the right resin is chosen.

  • Al Qusur is a residential district in Al Khobar in the Eastern Province, close to Ad Danah Ash Shamaliyah, Al Jamiah and Tihamah.
  • Porous concrete absorbs water slowly, so leakage can appear months after a tank has been filled.
What the service includes

The scope of the work in Al Qusur

  • Applying primer then epoxy coats across the full interior surface
  • Preparing the surface and leaving it completely dry
  • Closing the coating around pipe entries and the drain opening
  • Rinsing the tank after full cure before it is refilled
How we work

The steps of epoxy tank lining in Al Qusur

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

A smooth surface slows deposit build-upThe hard smooth finish reduces algae and deposits sticking to the tank walls, making periodic cleaning simpler.

Start from Al Qusur with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Qusur and around itIncluding Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on epoxy tank lining in Al Qusur

How do I know my tank in Al Qusur needs epoxy?

Signs such as damp patches on the outer wall or water dropping without an obvious cause often point to seepage. Send photos of the inside and outside and we will assess the condition with you.

Can an old tank in Al Qusur be coated after cleaning?

In most cases yes, since the surface has to be clean and dry for the resin to bond. We set out the steps after seeing the photos, and tell you if the concrete needs treatment first.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

Does the tank need cleaning before epoxy lining?

Yes, and this step cannot be skipped. Algae, lime deposits and dirt stop the epoxy bonding to the surface, leaving the lining weak and likely to detach early. Tank cleaning is a separate step that comes before the lining, and you can ask about it separately.

Do you offer epoxy tank lining in Al Qusur?

Yes. Al Qusur is within our service area in the Eastern Province, and we also work in Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah. Call us or send photos of the spot on WhatsApp.

What decides the cost of epoxy tank lining?

The interior surface area of the tank, its condition, how many cracks need treating before application, and how easily the tank opening can be reached. Send photos of the interior walls and the opening, with rough dimensions, on WhatsApp, and we will advise on the right treatment and the cost.

Nearby areas

Areas near Al Qusur

We also offer epoxy tank lining in Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah, among the closest areas to Al Qusur.

Other services in the area

More services in Al Qusur

Worker rolling the white insulation layer onto a roof

In Al Qusur and need epoxy tank lining?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp