
Tanks & roofs together in Al Qusur
We waterproof tanks and roofs together in Al Qusur, beginning with a clear photo of the overhead tank, its base and the roof around it, sent by call or WhatsApp. Buildings here range from older blocks to newer ones, and each has an overhead tank in a different position on its roof.
Al Qusur combines older residential buildings with newer ones within the same district, so roof tanks differ in age and material. In older blocks, cracks may appear at the tank base and at pipe entries after years of heat. Newer ones usually need only the joint between tank and roof treated. The photos decide where the work starts.
- Al Qusur is a district of Al Khobar in the Eastern Province, next to Ad Danah Ash Shamaliyah, Al Jamiah and Tihamah.
- The pipe connection to the tank body is the most common leak point in smaller roof tanks.
The tanks & roofs together work in Al Qusur
- Lining the tank with a layer suited to its type and condition
- Sealing pipe entries, the AC base, drain openings and the parapet
- Checking the tank base, the surrounding slab and locating the leak points
- Checking the seal at the tank base before the tank is put back in use
The stages of the work in Al Qusur
Send photos of the tank and roof
On WhatsApp: photos of the tank, its stand, the pipe entries, the surrounding roof and any stains, so we can read what each point needs and set the scope of the work.
Inspect and prepare
The tank base and the surrounding slab are checked, surfaces are cleaned of dust and deposits, and cracks, joints and drain openings are treated before any waterproof layer is applied.
Waterproof the tank, then the roof around it
The tank is lined on the inside with a layer suited to its type and condition, then the waterproof layer extends across the surrounding roof, turns up at the AC base, the parapet and every pipe entry, forming one connected waterproof surface.
Cure and hand over
The layers are left to dry and harden, and the seal at the tank base, pipe entries and drain openings is checked before the tank is put back in use.
Why Abraj Al Azl?
One weak point brings the leak backTreating the tank and its surroundings together reduces the chance of water finding a way through the edges after the work is done.
Your request from Al Qusur comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Al Qusur and around itIncluding Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah, as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Common questions on tanks & roofs together in Al Qusur
Does treatment in Al Qusur start with the tank or the roof?
Work starts wherever the leak appears in the photos, whether tank, roof or the joint between them. We do not begin a step before we know where the fault is.
Can you help with older buildings in Al Qusur?
Yes. Older buildings usually need concrete cracks repaired before lining. The photos let us judge this, and we will tell you if the structure needs more than that.
Which points on the roof around the tank are waterproofed?
The slab surrounding the tank base is waterproofed and the layer turns up at the tank wall. Supply and drain pipe entries are sealed, and the AC base, drain openings and parapet are treated depending on their condition and how close they are to the tank. The roof work completes the tank waterproofing; it does not replace it.
What decides the cost of waterproofing the tank and the roof together?
The tank size, the number of floors, the slab condition, the existing cracks, how much of the roof needs treatment, the number of pipe entries and how easily the roof can be reached. Send photos and rough dimensions on WhatsApp and we will set the scope.
Does the tank need to be empty before the work starts?
Yes. The inside walls cannot be cleaned, cracks treated or a waterproof layer applied while the tank is full. The tank is emptied and cleaned before the work starts, and refilled once the layers have dried and set. We agree the timing of emptying in advance.
Do you cover Al Qusur?
Yes. We serve Al Qusur and nearby areas such as Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
We also offer it in neighbouring areas
Nearby areas we also cover: Ad Danah Ash Shamaliyah, Al Jamiah (near Dhahran) and Tihamah.
More services in Al Qusur




