Abraj Al AzlContracting
Call العربية
Worker rolling blue epoxy on the wall of an empty concrete tank

Epoxy tank lining in Al Jamiah (near Dhahran)

Lined from the inside

Epoxy resin coating on the interior walls and floor of a water tank, stopping loss through porous concrete, cracks and joints

+966 54 311 2066
The service in your area

Epoxy tank lining in Al Jamiah (near Dhahran)

Epoxy tank lining in Al Jamiah begins with photos of the tank inside and out, sent by call or WhatsApp. Epoxy is a resin applied to the interior surface to prevent leaks through concrete, cracks and joints.

Al Jamiah contains diverse residential and commercial buildings, each with water tanks. Tanks here face high heat and coastal humidity, and cracks and leaks develop gradually over time, especially in older tanks. Epoxy coats the tank's walls and floor from inside with a tight layer that blocks water from pores and cracks. Photos show the concrete condition and crack depth so we choose the right number and thickness of layers with you.

  • Al Jamiah is a district in Dammam in the Eastern Province, lying close to Tihamah, Ad Danah Ash Shamaliyah and Al Qusur.
  • Tanks with flat floors collect sediment, which can hide small cracks that may leak water.
What the service includes

The scope of the work in Al Jamiah (near Dhahran)

  • Rinsing the tank after full cure before it is refilled
  • Checking the interior walls, the floor, the joints and the pipe entries
  • Treating hairline cracks and crumbling joints before application
  • Applying primer then epoxy coats across the full interior surface
How we work

The stages of the work in Al Jamiah (near Dhahran)

1

Send photos of the tank

On WhatsApp: photos of the interior walls, the floor, the joints and the pipe entries, so we can read the surface and decide the right treatment.

2

Empty and clean the tank

The tank is emptied completely and cleaned of deposits, algae and dirt, because epoxy will not bond to a wet or contaminated surface.

3

Prepare the surface and treat cracks

Hairline cracks and joints are treated, any weak layer is removed, and the surface is left completely dry before the primer and the epoxy coats go on.

4

Apply the epoxy and let it cure

Primer goes on first, then the epoxy coats are applied to the walls and floor. The lining is left to cure, then the tank is rinsed thoroughly before it is refilled.

What sets us apart

Why Abraj Al Azl?

A smooth surface slows deposit build-upThe hard smooth finish reduces algae and deposits sticking to the tank walls, making periodic cleaning simpler.

We serve Al Jamiah (near Dhahran) and around itIncluding Tihamah, Ad Danah Ash Shamaliyah and Al Qusur, as part of our work across the Eastern Province.

Start from Al Jamiah (near Dhahran) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

White stepped dome on an insulated roof above a street
Two workers on the roof insulating around an AC unit
Concrete roof exposed to the sun with cracks sealed in white lines
Indoor mosaic-tiled pool
Empty garden pool during waterproofing work
Worker applying the white insulation layer on a villa roof by the sea

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about epoxy tank lining in Al Jamiah (near Dhahran)

Must the tank be completely emptied to apply epoxy in Al Jamiah?

Yes, the tank must be completely empty and clean inside. We will help you plan to clean and dry it before coating starts once you send the photos.

How long does epoxy take to dry fully after application?

It depends on humidity and heat. When you send the photos and tell us where the tank is, we will advise on the expected time and how to avoid using the tank during drying.

Do you offer epoxy tank lining in Al Jamiah (near Dhahran)?

Yes. Al Jamiah (near Dhahran) is within our service area in the Eastern Province, and we also work in Tihamah, Ad Danah Ash Shamaliyah and Al Qusur. Call us or send photos of the spot on WhatsApp.

How long must the tank stay empty before it is refilled?

The epoxy needs enough time to dry and cure fully before it contacts water, and the tank is then rinsed once or more before use. The time depends on the type of epoxy and the air temperature, and we confirm it when the job is agreed.

What is the difference between epoxy and cementitious coating for tank internal waterproofing?

A cementitious coating is mineral-based, tolerates a damp surface and is naturally compatible with concrete, but it is less hard and leaves a rougher finish. Epoxy is harder and smoother and carries internal water pressure better, but it requires a completely dry surface. The choice depends on the tank's condition and how much moisture is in the walls.

Why does the surface have to be dry before epoxy?

Epoxy is a resin that reacts chemically with the substrate and hardens. Moisture prevents bonding and weakens the layer. The tank is left after cleaning until the surface is completely dry before application begins. This is why a cementitious coating is sometimes chosen when the concrete stays damp.

Nearby areas

The same service in nearby areas

We also work near Al Jamiah (near Dhahran), in Tihamah, Ad Danah Ash Shamaliyah and Al Qusur.

Other services in the area

More services in Al Jamiah (near Dhahran)

Worker rolling the white insulation layer onto a roof

Epoxy tank lining in Al Jamiah (near Dhahran)?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp