Abraj Al AzlContracting
Call العربية
Sealing a hairline crack at a joint of a concrete tank wall

Concrete tank waterproofing in Al Jishshah

Concrete absorbs water

Inspecting, preparing and treating cracks, joints and porosity in concrete tanks before waterproofing

+966 54 311 2066
The service in your area

Concrete tank waterproofing in Al Jishshah

Concrete tank waterproofing in Al Jishshah starts with a photo of the tank and its condition, sent by call or WhatsApp. The district has houses, villas and small apartment blocks, with water tanks either on the ground or roofs, exposed to heat, humidity and cracking.

Tanks in Al Jishshah vary greatly in age and condition across the different buildings. Older tanks often show hairline cracks at joints and pipe entries, and a ground tank may have moisture around it from soil and groundwater. A roof tank is stressed by the intense heat of the region all day. The photos you send show exactly what the problems are before we choose the right repair and waterproofing method for your tank.

  • Al Jishshah is a district in the Eastern Province, close to Al Markaz, Al Jafr and As Sabat, with houses, villas and small apartment blocks.
  • A concrete tank inland is exposed to intense heat without coastal humidity, causing rapid drying and cracking.
What the service includes

The scope of the work in Al Jishshah

  • Locating cracks, pour joints and pipe entries
  • Opening out cracks and filling them with a material suited to their movement
  • Cleaning the surface and removing any flaking or loose render
  • Checking the inside and outside walls and the tank base
How we work

How we carry out concrete tank waterproofing in Al Jishshah

1

Send photos of the tank

On WhatsApp: photos of the inside and outside walls, the base, any damp spots and the pipe entries, so we can read the problem and decide what the tank needs.

2

Inspect the internal surface

The concrete surface is checked inside: hairline cracks, pour joints, pipe entries and any spot where the render has flaked or separated. This check decides how the surface is prepared.

3

Clean the surface and treat the cracks

The walls and base are cleaned thoroughly, cracks are opened out and filled with a material that suits their movement, and pour joints and pipe entries are treated carefully before the next step.

4

Prepare the surface for the coating

After the cracks are treated, the surface is left to settle as the chosen coating requires, then it is profiled by roughening or smoothing as needed so the layer bonds and holds.

What sets us apart

Why Abraj Al Azl?

The coating stays where it is placedA prepared surface with no open cracks and no flaking areas is what a coating bonds to and stays effective on.

Concrete tank waterproofing in Al JishshahWe choose the method and the materials once we know the condition of the spot.

Your request from Al Jishshah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street
Concrete roof exposed to the sun with cracks sealed in white lines
Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on concrete tank waterproofing in Al Jishshah

Do you repair cracks in an old concrete tank in Al Jishshah?

Yes, we inspect cracks first through photos and then determine if they are surface or deep. Hairline cracks are treated with specialist injection, and deeper cracks may need cleaning and extra lining before sealing.

Why might a concrete tank crack in an area like Al Jishshah?

Intense heat and direct sun exposure cause repeated expansion and contraction in the concrete, especially in roof tanks. Water and dissolved minerals can also affect joints and pores.

Does the tank have to be emptied before inspection and treatment?

Yes. A proper inspection of the inside walls and the base needs the tank emptied and cleaned. The actual treatment cannot be applied to a surface holding water. Send us outside photos first, and when we agree the job we tell you what to prepare.

Do you offer concrete tank waterproofing in Al Jishshah?

Yes. Al Jishshah is within our service area in the Eastern Province, and we also work in Al Markaz, Al Jafr and As Sabat. Call us or send photos of the spot on WhatsApp.

Can cracks in an old tank be treated rather than replacing the whole tank?

In most cases the cracks can be treated and the inside surface renewed with a suitable waterproof coating without demolishing the tank. Replacement only becomes the option if there is serious structural deformation. Photos help us assess the situation.

Why do cracks form in new concrete tanks?

Concrete shrinks as it cures after pouring, and that shrinkage opens hairline cracks especially at joints between the wall and the base and between separate pours. High temperatures add to this effect. Cracks do not necessarily mean a building fault, but they need treatment before the tank is filled.

Nearby areas

The same service in nearby areas

If the site is outside Al Jishshah, the same service is available in Al Markaz, Al Jafr and As Sabat.

Other services in the area

More services in Al Jishshah

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in Al Jishshah
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp