
Pool waterproofing after tiling in Makkah
Pool waterproofing after tiling in Makkah begins with photos of the pool and any leak or dampness marks, sent by call or WhatsApp. The district has varied villas and residential buildings, some with private pools that may show leaks from tile and joints after years of construction.
Pools in Makkah differ in age, size and material; an older concrete pool may show hairline cracks, while a newer one may only need mortar and tile renewal. Intense heat and dryness affect tile and mortar adhesion, causing shrinkage that leads to cracks. Leaks may come from the floor, walls or joints around water entry and exit. Clear photos from all pool areas show the leak source and damage degree, so we can choose the right method with you.
- Makkah is a district in the Eastern Province, near Al Fanatir, Najd and Al Hijaz, with varied villas and residential buildings.
- Pool tile in dry regions faces intense thermal stress, with more cracks and broken joints developing.
The main items of pool waterproofing after tiling in Makkah
- Lifting damaged tiles and rebuilding the layer behind them where needed
- Injecting cracks with a compound suited to the concrete shell
- Testing the leak area with dye and pressure-checking the lines
- Resealing joints with a flexible water-resistant compound
How we carry out pool waterproofing after tiling in Makkah
Send photos of the pool
On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.
Locate the source of the leak
A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.
Treat the leak point
Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.
Verify and cure
After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.
Why Abraj Al Azl?
Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.
Start from Makkah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Pool waterproofing after tiling in MakkahWe choose the method and the materials once we know the condition of the spot.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on pool waterproofing after tiling in Makkah
Does intense dryness in Makkah affect pool waterproofing?
Yes, dryness causes rapid shrinkage in concrete, mortar and tile, creating cracks and gaps that allow water through. So waterproofing materials must tolerate these sharp thermal changes.
Does salt water in Makkah pools affect waterproofing?
Yes, salt speeds mortar and tile erosion. If the pool is filled with salt water or soaked in salt for therapy, tell us so we choose the right material. Photos show whether salt marks are present.
How do I know my pool is leaking and not just evaporating?
Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.
What should I send you from Makkah?
Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Makkah, and we will work out the next step with you.
Can the pool be used straight after treatment?
No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.
What decides the cost of waterproofing a pool after tiling?
The size of the pool, the number and type of leak points, whether tiles need lifting, the condition of the layer behind the tiles, and how easily the pump and drain lines can be reached. Send photos and rough dimensions on WhatsApp and we will suggest the right treatment.
We also offer it in neighbouring areas
We also offer pool waterproofing after tiling in Al Fanatir, Najd and Al Hijaz, among the closest areas to Makkah.
More services in Makkah


