Abraj Al AzlContracting
Call العربية
Mosaic-tiled seaside pool

Pool waterproofing after tiling in Najd

The pool is losing water

Treating leaks in a tiled pool: locating the source, then sealing joints, cracks and fittings

+966 54 311 2066
The service in your area

Pool waterproofing after tiling in Najd

We treat leaks in tiled pools across Najd, beginning with identifying the source and then sealing joints, cracks and fittings. Send pool photos by call or WhatsApp so we can agree on what is needed.

Najd is largely detached houses and villas with wide yards, many containing a tiled pool. Exposed edges take sun and dust, so joints wear and the seal weakens over time. The photos pinpoint weak spots and show whether the problem lies in the tiles or in the fittings around the pool.

  • Najd is a residential district in Hofuf, Al-Ahsa, near Al Fanatir, Makkah and Al Andalus.
  • Dust builds up in exposed joints and stops the sealant bonding properly over time.
What the service includes

What we do for you in Najd

  • Testing the leak area with dye and pressure-checking the lines
  • Injecting cracks with a compound suited to the concrete shell
  • Resealing joints with a flexible water-resistant compound
  • Closing pump, light and return fittings from inside
How we work

The stages of the work in Najd

1

Send photos of the pool

On WhatsApp: photos of the pool walls, floor, drain and skimmer, the pump connections, light and return fittings and any damp on the outside, so we read the situation before anything else.

2

Locate the source of the leak

A dye test is run at the joints, fittings and cracks to trace where the water moves, and the pump and drain lines are pressure-checked, so we know exactly where the water is leaving.

3

Treat the leak point

Depending on the source: cracks are injected, joints are resealed with a flexible compound, fittings are tightened from inside, or tiles in the affected area are lifted where the layer behind them has broken down.

4

Verify and cure

After treatment the surface is left to dry and cure, then the pool is filled and the level is watched again to confirm that the source has been closed.

What sets us apart

Why Abraj Al Azl?

Tiles are lifted only where neededPinpointing the source limits the work to the affected zone and leaves the rest of the tiling untouched.

We serve Najd and around itIncluding Al Fanatir, Makkah and Al Andalus (near Al Fadili), as part of our work across the Eastern Province.

Start from Najd with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Empty garden pool during waterproofing work
Empty seaside pool during waterproofing
Pool at night with water jets after waterproofing
Indoor mosaic-tiled pool
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Najd

Does a leak in a Najd pool always mean the tiles are damaged?

Not necessarily, as the leak often comes from a joint or a fitting near the filter rather than the tiles themselves. The photos help tell the two apart before any work.

When is the best time to treat a pool leak in Najd?

That depends on the pool's condition and whether you can partly drain it, which we settle after reviewing the photos. There is no fixed timeline for every case.

How do I know my pool is leaking and not just evaporating?

Turn the pump off, mark the water level at a tile line and leave it for a full day. If the level drops more than weather and evaporation explain, there is very likely a leak. Send us your reading on WhatsApp with a photo of the drain area and the walls.

Can the pool be used straight after treatment?

No. The materials used need time to dry and cure before the pool is filled. After filling, the level is watched to confirm the leak is closed. We tell you the waiting period based on the materials and conditions when the work is agreed.

Does the pool have to be emptied before the leak is found?

Not always. A dye test is done with the pool full and shows water movement at joints and fittings. Emptying is needed when the pressure lines are tested or when the layer behind the tiles is being treated. After we see the photos we advise which step comes first.

What should I send you from Najd?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Najd, and we will work out the next step with you.

Nearby areas

Pool waterproofing after tiling near Najd

Nearby areas we also cover: Al Fanatir, Makkah and Al Andalus (near Al Fadili).

Other services in the area

More services in Najd

Pool at night with water jets after waterproofing

Tell us about your site in Najd
and we will plan the next step with you

Describe the problem and where it is in Najd, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp